Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “storage drawal T-GNA”: 10 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Proposed Amendments to Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 — Explanatory Memorandum
Draft- 7.1. Draft MERC (Intra-State Transmission Connectivity and …… standalone Energy Storage Systems ("ESS") having a minimum injection or drawal capability of 5 MW, including through aggregation; Lead Generators or Lead ESS aggregators having an aggregate capacity of 5 MW and above; authorised …
- 7.1. Draft MERC (Intra-State Transmission Connectivity and …… the Draft Regulations prescribe minimum usable storage of 1 MWh per MW of sanctioned connectivity for applications granted up to the year 2030 and 2 MWh per MW for applications granted thereafter. …
3 matching passages in this document
Himachal Pradesh Electricity Grid Code Regulations, 2025 — Draft
Draft- 3. Definitions.- In these Regulations, unless the context …… „Drawal Schedule‟ means the summation of the station-wise GNA and T-GNA and intra-State Schedule (42) „Emergency state‟ means the state in which one or more operational parameters are outside their operating limit or many of the …
- CHAPTER 8 SCHEDULING AND DESPATCH CODE… The same shall be intimated to drawee GNA grantees by 8.15 AM on "D-1" day. (II) The SLDC shall intimate the constraint in transmission system as intimated by NRLDC to the respective drawee GNA grantees by 8.15 AM on "D-1" day. …
2 matching passages in this document
Gujarat Electricity Grid Code, 2026 — Draft
Draft- 2 Definitions › (g) Allocation of corridors by RLDC for GNA grantees… SLDC/ Drawee GNA grantees shall revise their requisition for drawal schedule based on availability of transmission corridors for such grantee by 8:30 AM on 'D-1' day, as applicable. …
- 2 Definitions › (g) Allocation of corridors by RLDC for GNA grantees… entities data received from power exchanges, SLDC shall issue final drawal schedule and injection schedule of the State entities on 13:30 Hrs. …
3 matching passages in this document
Connectivity and General Network Access to Intra-State Transmission and State Distribution System Regulations, 2026 — Draft
Draft- 27 Application for grant of T-GNA… Point of drawal; b) Exigency application category: i. Contracted quantum of power (MW) to be scheduled at point of injection; ii. Start time of T-GNA in terms of time-block and date; iii. End time of T-GNA in terms of time-block and …
- 2 Definitions › The Secretary, Karnataka Electricity Regulatory Commission, …"T-GNA Grantee" means a person which has been granted T-GNA under these regulations; (yy) "Transmission Capacity Right" means the right of a Transmission System User to transfer electricity in MW, under normal circumstances, …
3 matching passages in this document
Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
Draft- Regional Transmission Deviation Account › Unquote… Hence, any drawl beyond such identified power even within the GNARE/T-GNARE quantum is a transmission deviation. The transmission deviation should be calculated with respect to the scheduled drawal under GNARE or T-GNARE. …
- CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI › 12. Transmission Deviation… transmission deviation in a time block shall be net metered drawal in excess of sum of GNA and T-GNA for all drawee DICs which are intra-State entities in that State: Provided that, where a State has net metered injection in a time …
3 matching passages in this document
Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
DraftSharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft
Draft- 2. Amendment to Regulation 2 of the Principal Regulations › 3. Amendment to Regulation 12 of the Principal Regulations… which is an intra-State entity of a State obtains GNARE or T-GNARE, as permitted under GNA Regulations, transmission deviation for the State in a time block shall be net metered drawal in excess of sum of (GNA and T-GNA for all drawee …
- 2. Amendment to Regulation 2 of the Principal Regulations › 3. Amendment to Regulation 12 of the Principal Regulations… if permitted under the GNA Regulations, the transmission deviation shall be computed as net metered drawal, in a time block in excess of the sum of 'GNA to the inter-State transmission system and Access with STU system': …
2 matching passages in this document
BSPTCL and SLDC comments on the Draft Bihar Electricity Grid Code Regulations, 2026
Draft- Annexure -1 › Chapter 8: SCHEDULING AND DESPATCH CODE… Real-time monitoring of the injection, drawal and deviation of the Sellers and Buyers; iii. Monitoring declared capacity, schedules and forecasts to ensure that no Grid Connected Entity indulges in gaming, iv. …
- Annexure -1 › Chapter 8: SCHEDULING AND DESPATCH CODE… and the drawal schedule of the buyer. Time format may kindly be made uniform in all clauses of the regulation 8.9. 8.9.1.r.(iii) (iii) SLDC shall issue final drawl schedules for STOA/T-GNA grantees by 9.30 AM of 'D-1' day. …
2 matching passages in this document
Draft Bihar Electricity Grid Code, 2026 — Consultative Paper
Draft- 8. Declaration of Declared Capacity by Intra State entity … › 12. Minimum turndown level for intra-State entity thermal …… or ESS or a drawee entity shall be allowed to schedule injection or drawal only up to its effective Intra State Open access quantum, GNA quantum and T-GNA quantum, as applicable, in accordance with the Intra State Open access …
- 2.Issuance of day-ahead schedule… intra state entities including the information received from RLDC for the GNA grantees and T-GNA grantees: (i) The ex-power plant schedule to each of the regional entity generating station and In-SGS, in MW for different time blocks …
3 matching passages in this document
Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
Draft- 8. Amendment to Regulation 22 (3): Delay in demonstration …… T-GNA, curtailment instructions by RLDC, ROW, weather disruptions, etc., are not covered under the Regulations. 8.3 With regard to the suggestions of Ayana, we observe that a time of one year is already provided under the Regulations and …
- 15.3 Clause 10 of Regulation 45 of the Principal … › Decision of the Forum… T-GNA, including already approved T-GNA, for the sale and purchase of electricity through short term contracts, including in the power exchange, shall be regulated entirely: Provided further that the NLDC may, under exceptional …
3 matching passages in this document