Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2026.

Explanatory memorandum to a draftDated 21 Sep 2026L-1/265/2022/CERC dated 21.09.2026

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum, dated 21.09.2026, for a draft Second Amendment to the Indian Electricity Grid Code Regulations, 2020, which the text says were notified on 29.05.2023 and effective from 1.10.2023 (p1). It is not the amendment itself: it explains the proposed changes, quotes the existing provisions and records stakeholder and system-operator inputs.

Sections 1–2 set out the background and the proposed package, including changes flowing from the Suo-moto Orders of 22.12.2024 and 05.10.2025. These cover instalment trial runs for large projects, a new Regulation 25A on scheduling infirm power after trial run, limits on peak versus off-peak declared capacity, and revised unit-shutdown/SCUC timelines (pp1–5).

Sections 3–8 deal with interconnection and trial run: RLDC extensions for REGS/ESS, a shorter trial-run notice period, special trial-run capacity treatment for NER, Sikkim and BBMB entities, a minimum ESS trial-run capacity, unit-wise trial runs for pumped storage, and relief where transmission delays prevent demonstration of rated capacity (pp5–14). Section 9 extends automatic despatch-centre operation to PSPs and ESS; Sections 10–11 separate PSP COD and delink renewable/ESS COD from PPA conditions (pp14–17).

Sections 12–13 add PSPs and ESS to primary-response and droop requirements and revise reserve estimation, including quarter-ahead assessment and obligations on regional bulk consumers (pp17–26). Section 14 brings congestion charges into the Grid Code and proposes repeal of the 2009 congestion-relief regulations, with transitional continuation of the old rate and procedure (pp26–29). Sections 15–18 cover hydro high-inflow revision, access regulation for defaulters in statutory charges, free-power scheduling from central hydro busbars, and alternate-source supply (pp29–36). Sections 19–20 make miscellaneous changes and phase the shortening of RTM gate closure—Phase 1 to 31.03.2027, Phase 2 from 01.04.2027—with consequential schedule-revision changes (pp36–50).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Ancillary services and reserves

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.