Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
Draft Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2026.
Explanatory memorandum to a draftDated 21 Sep 2026L-1/265/2022/CERC dated 21.09.2026
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum, dated 21.09.2026, for a draft Second Amendment to the Indian Electricity Grid Code Regulations, 2020, which the text says were notified on 29.05.2023 and effective from 1.10.2023 (p1). It is not the amendment itself: it explains the proposed changes, quotes the existing provisions and records stakeholder and system-operator inputs.
Sections 1–2 set out the background and the proposed package, including changes flowing from the Suo-moto Orders of 22.12.2024 and 05.10.2025. These cover instalment trial runs for large projects, a new Regulation 25A on scheduling infirm power after trial run, limits on peak versus off-peak declared capacity, and revised unit-shutdown/SCUC timelines (pp1–5).
Sections 3–8 deal with interconnection and trial run: RLDC extensions for REGS/ESS, a shorter trial-run notice period, special trial-run capacity treatment for NER, Sikkim and BBMB entities, a minimum ESS trial-run capacity, unit-wise trial runs for pumped storage, and relief where transmission delays prevent demonstration of rated capacity (pp5–14). Section 9 extends automatic despatch-centre operation to PSPs and ESS; Sections 10–11 separate PSP COD and delink renewable/ESS COD from PPA conditions (pp14–17).
Sections 12–13 add PSPs and ESS to primary-response and droop requirements and revise reserve estimation, including quarter-ahead assessment and obligations on regional bulk consumers (pp17–26). Section 14 brings congestion charges into the Grid Code and proposes repeal of the 2009 congestion-relief regulations, with transitional continuation of the old rate and procedure (pp26–29). Sections 15–18 cover hydro high-inflow revision, access regulation for defaulters in statutory charges, free-power scheduling from central hydro busbars, and alternate-source supply (pp29–36). Sections 19–20 make miscellaneous changes and phase the shortening of RTM gate closure—Phase 1 to 31.03.2027, Phase 2 from 01.04.2027—with consequential schedule-revision changes (pp36–50).
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
- Dated 2 Aug 2024Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 16 Apr 2024Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
- Dated 12 Mar 2025Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 7 Jun 2022Indian Electricity Grid Code Regulations, 2022 — Draft
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 9 Oct 2022Explanatory memorandum: Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
- Dated 12 Jun 2024Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
- Released with the notice dated 12 Jun 2024Explanatory memorandum: Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.