Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2026.

Explanatory memorandum to a draftDated 31 Jul 2026L-1/250/2019/CERC dated 31.07.2026

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This explanatory memorandum, dated 31.07.2026, accompanies the draft Fifth Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 (p1). It reproduces the relevant principal-regulation text, stakeholder letters and Commission reasoning, and proposes specific clause changes. It is a consultation draft, not a final regulation, and several proposals depend on separate GNA amendments and NLDC procedures (p18–22).

Parts 2–3 concern storage waivers. For ESS that is integral to a REGS or RHGS, the waiver tenure is proposed to follow the REGS commercial operation date, with storage treated as part of that entity and a separate storage waiver period retained (p2–4). A new proviso would allow co-located BESS to charge in more than one daily cycle, including from a non-co-located RE source, with NLDC to frame accounting modalities (p4–6).

Parts 4–5 deal with the 51% renewable-charging condition. G-DAM purchases may count if the power exchange gives a source-wise certificate, following the RPO/RCO accounting precedent (p6–9). For hydro PSPs with multiple beneficiaries, the 51% test may be applied contract by contract through tagging and NLDC verification; the concession does not extend to BESS (p9–12).

Part 6 implements the Ministry of Power OM of 16.04.2026 for RE projects delayed by transmission non-readiness. It sets conditions around firm PPAs, connectivity start dates and COD within two months of GNA effectiveness, proposes extending the PPA cut-off date, and gives eligible projects a one-time choice between waiver pathways (p12–16).

Parts 7–9 change transmission-deviation accounting for intra-State GNARE/T-GNARE and dual-connected drawee entities drawing through STU feeders (p16–21), then make consequential Annexure-III changes, add Regulation 29 on suo motu orders and practice directions, and require NLDC to issue a revised procedure (p21–22).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Energy storage deployment, Deviation settlement (DSM)

Read with this

Other copies of these documents (5)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document