Skip to content

Search the library

Filters
Year
—

Showing the best matches for “T-GNA corridor allocation”: 10 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.

The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.

  1. CERC · Procedure · Dated 29 Sep 2023 · Transmission

    Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023

    3 matching passages in this document

  2. CERC · Regulation · Dated 7 Jun 2022 · Transmission

    Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

    4 amendments on Voltaic

    3 matching passages in this document

  3. CERC · Regulation · Gazette copy · Dated 7 Jun 2022 · Transmission

    Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

  4. CERC · Consolidated copy · Dated 7 Jun 2022 · Transmission

    Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Consolidated

    2 matching passages in this document

  5. CERC · Regulation · Dated 29 May 2023 · Grid Operations

    Indian Electricity Grid Code Regulations, 2023

    1 amendment on Voltaic

    3 matching passages in this document

  6. CERC · Regulation · Gazette copy · Dated 29 May 2023 · Grid Operations

    Indian Electricity Grid Code Regulations, 2023

    3 matching passages in this document

  7. CERC · Order · Dated 30 Sep 2023 · Grid Operations

    Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)

    3 matching passages in this document

  8. CERC · Order · Dated 22 Sep 2023 · Transmission

    Connectivity and GNA Regulations, 2022 — Removal of Difficulties (First Order), 2023

    3 matching passages in this document

  9. CERC · Amendment · Dated 31 Aug 2025 · Transmission

    Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025

    Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

  10. CERC · Statement of reasons · Dated 2 Aug 2024 · Grid Operations

    Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons

    3 matching passages in this document