CERC · Central Electricity Regulatory Commission

Connectivity and GNA Regulations, 2022 — Removal of Difficulties (First Order), 2023

Removal of Difficulties (First Order) in giving effect to certain provisions of Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

OrderDated 22 Sep 2023Petition No. 11/SM/2023 dated 22.09.2023

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 42. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's first Removal of Difficulties order for the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 — Petition No. 11/SM/2023, order dated 22.09.2023 (p1). It exists because the GNA Regulations took effect in two stages (5.4.2023 for most provisions, 1.10.2023 for the rest), with the Indian Electricity Grid Code 2023 and the repeal of the 2009 Connectivity Regulations also landing on 1.10.2023 (p1–2). CTUIL reported through five letters in July–September 2023 that it could not implement parts of the regime, and RE developers wrote in separately; the order disposes of fifteen issues one by one, distinguishing those that need a clarification from those that will need an amendment to the GNA Regulations.

Issues 1–5 (p2–9) govern the transition. CTUIL may keep processing firming-up of allocation, Section-68 dedicated-line requirements and LTA operationalisation under the 2009 Connectivity Regulations for the interim window from 5.4.2023 to 30.09.2023; on bank guarantees it may hold the higher of the two regimes' requirements, no second Conn-BG1 is needed where one already exists, and the Conn-BG obligations of intra-State injecting entities and of bulk consumers/distribution licensees under Regulation 17.1(iii) are mapped onto the relevant transition clauses.

Issues 6–8 (p9–15) deal with early commissioning of a terminal bay for start-up power or infirm power injection, the meaning of the 'within the region'/'from outside the region' bifurcation of GNA (planning and constrained-corridor allocation only, not a limit on scheduling), and the re-basing of States' deemed GNA bifurcation against September 2022 LTA/MTOA contracts.

Issues 9–11 (p15–20) relax the processing timelines for new applications until transition is complete, and grant or adjust deemed GNA for cross-border and specific cases: PTC for the Bhutan hydro stations, East Central Railway's 20 MW at a new drawl point, and Bangladesh's deemed GNA revised to 982 MW on the strength of NLDC's billing notification.

Issues 12–15 (p20–31) cover RE connectivity through a Letter of Award issued by a Bid Process Coordinator under MoP's 27.8.2022 bundling guidelines (PPA with the procurer accepted as an eligible document, with staff directed to process an amendment), the date from which Regulation 11A equity and financial-closure timelines run for transitioning entities, permission to change land parcel without changing the connectivity point or start date, and transfer of connectivity, including full-quantum transfer.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Cross-border trade

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document