CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Statement of Reasons – Indian Electricity Grid Code Regulations, 2023
Statement of reasonsDated 2 Aug 2024File No. L-1/265/2022/CERC dated 02.08.2024
The commission's reasons for the Indian Electricity Grid Code Regulations, 2023 or one of its amendments.
Summary
Summary written by software, from pages 1 to 28 of 273. Check the regulator's original before you rely on it.
This is CERC's Statement of Reasons for the CERC (Indian Electricity Grid Code) Regulations, 2023, issued on 02.08.2024 (p1). It explains the Commission's decisions on stakeholder comments received on the Draft CERC (Indian Electricity Grid Code) Regulations, 2022 and records what was accepted, modified, deleted or retained (p1–2). It is not the Grid Code itself; it accompanies the 2023 Grid Code, which was notified on 29.05.2023 and made effective from 01.10.2023 (p2). The 2023 code is described as having 10 chapters and 7 annexures, with new Protection Code, Cyber Security Code and Monitoring & Compliance Code, and the Planning Code renamed Resource Planning Code (p2).
Chapter 1 (Preliminary) deals with applicability and definitions (p3–14). It expands the class of entities covered by adding REMC, Regional Power Committees, Settlement Nodal Agencies, Qualified Coordinating Agencies and Power Exchanges, while rejecting inclusion of the OTC platform (p3–4). It discusses revised definitions including Alert State, Emergency State, Normal State, Operational Parameters, Near Miss Event, Resilience, Minimum Turndown Level, Primary Reserve, Secondary Reserve, Demand, Bilateral Transaction, Auxiliary Energy Consumption, Captive Generating Plant, Intermediary Procurer and Generating Unit (p4–14), and deletes Grid-forming capability (p9).
Chapter 2 (Resource Planning Code) covers integrated resource planning, demand forecasting, generation resource adequacy and transmission resource adequacy (p15–26). It requires distribution licensees to estimate demand over long-, medium- and short-term horizons, factoring open access, captive generation, energy efficiency, distributed generation and demand response (p18). STUs or designated agencies aggregate state demand (p19), NLDC runs a simulation to assist state adequacy plans (p21–22), and distribution licensees must demonstrate resource adequacy with SERC-specified non-compliance charges (p22–23). CTU and STU transmission adequacy obligations are retained, with ESS-related monetisation left to Ancillary Services Regulations (p24–26).
Chapter 3 (Connection Code) begins at p27. It modifies the timing of tests, requiring tests before declaration of commercial operation but not necessarily before trial run (p27), and adds CEA Grid Standards Regulations 2010, CEA Cyber Security Guidelines 2021 and CEA Flexible Operation Regulations 2023 to the compliance list (p28).
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 16 Apr 2024Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
- Dated 12 Mar 2025Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Explanatory memorandum: Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 7 Jun 2022Indian Electricity Grid Code Regulations, 2022 — Draft
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 9 Oct 2022Explanatory memorandum: Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
- Dated 12 Jun 2024Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
- Released with the notice dated 12 Jun 2024Explanatory memorandum: Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.