CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons

Statement of Reasons – Indian Electricity Grid Code Regulations, 2023

Statement of reasonsDated 2 Aug 2024File No. L-1/265/2022/CERC dated 02.08.2024

The commission's reasons for the Indian Electricity Grid Code Regulations, 2023 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 28 of 273. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the CERC (Indian Electricity Grid Code) Regulations, 2023, issued on 02.08.2024 (p1). It explains the Commission's decisions on stakeholder comments received on the Draft CERC (Indian Electricity Grid Code) Regulations, 2022 and records what was accepted, modified, deleted or retained (p1–2). It is not the Grid Code itself; it accompanies the 2023 Grid Code, which was notified on 29.05.2023 and made effective from 01.10.2023 (p2). The 2023 code is described as having 10 chapters and 7 annexures, with new Protection Code, Cyber Security Code and Monitoring & Compliance Code, and the Planning Code renamed Resource Planning Code (p2).

Chapter 1 (Preliminary) deals with applicability and definitions (p3–14). It expands the class of entities covered by adding REMC, Regional Power Committees, Settlement Nodal Agencies, Qualified Coordinating Agencies and Power Exchanges, while rejecting inclusion of the OTC platform (p3–4). It discusses revised definitions including Alert State, Emergency State, Normal State, Operational Parameters, Near Miss Event, Resilience, Minimum Turndown Level, Primary Reserve, Secondary Reserve, Demand, Bilateral Transaction, Auxiliary Energy Consumption, Captive Generating Plant, Intermediary Procurer and Generating Unit (p4–14), and deletes Grid-forming capability (p9).

Chapter 2 (Resource Planning Code) covers integrated resource planning, demand forecasting, generation resource adequacy and transmission resource adequacy (p15–26). It requires distribution licensees to estimate demand over long-, medium- and short-term horizons, factoring open access, captive generation, energy efficiency, distributed generation and demand response (p18). STUs or designated agencies aggregate state demand (p19), NLDC runs a simulation to assist state adequacy plans (p21–22), and distribution licensees must demonstrate resource adequacy with SERC-specified non-compliance charges (p22–23). CTU and STU transmission adequacy obligations are retained, with ESS-related monetisation left to Ancillary Services Regulations (p24–26).

Chapter 3 (Connection Code) begins at p27. It modifies the timing of tests, requiring tests before declaration of commercial operation but not necessarily before trial run (p27), and adds CEA Grid Standards Regulations 2010, CEA Cyber Security Guidelines 2021 and CEA Flexible Operation Regulations 2023 to the compliance list (p28).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Resource adequacy, Connectivity and GNA

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document