CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)

Removal of difficulties (First Order) in giving effect to certain provisions of Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.

OrderDated 30 Sep 2023Petition No. 14/SM/2023 dated 30.09.2023

Made under the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's first "removal of difficulties" order for the Indian Electricity Grid Code (IEGC) 2023, issued suo motu as Petition 14/SM/2023 and dated 30.09.2023 — the day before the Grid Code came into force on 01.10.2023 (p1). Acting under Regulation 58 read with Regulation 60 of the Grid Code (p16–17), the Commission responds to representations from NHPC, SJVN, NTPC, THDC, Grid-India and NERPC and converts each difficulty into a clarification or practice direction, issue by issue.

Issues 1–3 deal with scheduling and Declared Capacity (DC). Issue 1 construes "D" in the D+2 scheduling rule of Regulation 27(2) as the date the generator *intimates* commercial operation rather than the COD itself, so that a plant can start scheduling from 0000 hrs of D+2 after giving the RLDC two days' notice (p2–3). Issue 2 clarifies that the revision of DC from the 7th/8th time block after a forced outage and the declaration of estimated restoration time are not to be counted as revisions against the once-a-day limit in Regulation 49(7), with a worked example (p5). Issue 3 is the substantive relaxation: generators and ESS covered by Regulation 49(7) get two DC/schedule revisions a day for partial outage, hydro water-availability swings and gas supply variation, effective from the 7th/8th block — but only for six months from 1.10.2023, subject to a digital record of reasons, RPC review and a three-month NLDC report (p8).

Issues 4–9 address shutdowns, renewables, storage and transmission. Issue 4 limits the obligation to supply from alternate sources to cases where the generator retains its Declared Capacity (p9–10). Issue 5 extends forecasting-error schedule revision to wind/solar and run-of-river generators under both GNA and deemed T-GNA, for bilateral transactions (p10–12). Issue 6 lets a pumped storage plant declare COD after demonstrating capability at available water drawing levels, subject to later demonstration at rated levels (p12–14). Issue 7 removes the beneficiary's consent requirement for a section 62 generator selling un-requisitioned surplus in the day-ahead market (p14–15). Issue 8 gives pre-approved STOA transactions converted to exigency T-GNA priority in corridor allocation on D-1 (p15). Issue 9 directs the existing first-time charging procedure to continue until the Grid Code procedure NLDC submitted on 28.09.2023 is approved (p15–16).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document