Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “T-GNA corridor allocation”: 10 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023
- 5.2. Allocation of Transmission Corridor and Scheduling of …… RLDCs shall check if the drawl schedules as requisitioned by the drawee T-GNA grantees can be allowed based on the available import/export transfer capability and the standing clearance issued by the NLDC/RLDC/SLDC. …
- 5.4. Allocation of Transmission Corridor and Scheduling of …… Allocation of Transmission Corridor and Scheduling of Exigency Bilateral Transactions a) After the finalisation of the collective transactions under IDAM, Exigency applications for the grant of T-GNA shall be processed in accordance with …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
4 amendments on Voltaic
- 35. Information about applications under T-GNA › Chapter 7 Allocation of Transmission Corridor under GNA and …Chapter 7 Allocation of Transmission Corridor under GNA and T-GNA 36.1. GNA grantee shall be eligible to schedule power within the GNA granted to it under any contract subject to conditions specified in the Grid Code: …
- 35. Information about applications under T-GNA › Chapter 7 Allocation of Transmission Corridor under GNA and …Once the day ahead schedule is finalised for the GNA grantees, schedule for T-GNA grantees under Advance application category of T-GNA shall be finalised over the balance transmission corridor. …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Consolidated
- 35. Information about applications under T-GNAOnce the day ahead schedule is finalised for the GNA grantees, schedule for T-GNA grantees under Advance application category of T-GNA shall be finalised over the balance transmission corridor. …
- 35. Information about applications under T-GNAChapter 7 Allocation of Transmission Corridor under GNA and T-GNA
2 matching passages in this document
Indian Electricity Grid Code Regulations, 2023
1 amendment on Voltaic
- 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE … › (g) Allocation of corridors by RLDC for GNA granteesOther drawee T-GNA grantees who are regional entities, shall furnish time blockwise requisition for drawl to concerned RLDC in accordance with contracts by 9 AM of 'D-1' day. (iii) Allocation of corridors by RLDC for T-GNA grantees: …
- 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE … › (g) Allocation of corridors by RLDC for GNA grantees… Allocation of corridors by RLDC for GNA grantees (i) RLDC shall check if drawl schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: …
3 matching passages in this document
Indian Electricity Grid Code Regulations, 2023
- 48. SCHEDULING FROM ALTERNATE SOURCE OF POWER BY A … › 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE …Other drawee T-GNA grantees who are regional entities, shall furnish time block-wise requisition for drawl to concerned RLDC in accordance with contracts by 9 AM of "D-1" day. (iii) Allocation of corridors by RLDC for T-GNA grantees: …
- 48. SCHEDULING FROM ALTERNATE SOURCE OF POWER BY A … › 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE …Allocation of corridors by RLDC for GNA grantees (i) RLDC shall check if drawl schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: …
3 matching passages in this document
Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Issue No. 7: Consent to a generator for scheduling in the … › Issue No. 8: Transition from STOA to T-GNA regime… Transition from STOA to T-GNA regime 39. Grid-India has submitted that queries have been raised by stakeholders regarding the priority of allotment of transmission corridor of exigency T-GNA transactions which have been created through …
- Issue No.2: Revision of estimated restoration time in case … › Issue No. 5: Revision of schedule of RE Generators under …… Revision of schedules on request of buyers which are GNA grantees: (a) SLDCs on behalf of intra-state entities, regional entity ESSs as drawee entities, beneficiaries, regional entity buyers or cross-border buying entities may revise …
3 matching passages in this document
Connectivity and GNA Regulations, 2022 — Removal of Difficulties (First Order), 2023
- Issue No.7: Bifurcation of GNA as "within the region" and … › 15. Transmission Corridor allocation… Transmission Corridor allocation 15.1 Once a State has GNA quantum, it can request scheduling from injection point of its choice as per its contract. The methodology of scheduling and priority of transmission corridor allocation shall be …
- Issue No.7: Bifurcation of GNA as "within the region" and …… NLDC and RLDC keep the corridor booked for LTA and MTOA based on identified PPA and release the balance corridor for STOA. (b) Under the proposed GNA framework, a GNA grantee has the flexibility, within its GNA, …
3 matching passages in this document
Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
- 53.Procedure for Scheduling and Despatch for Inter-State … › (3) Power to revise schedules… it becomes inevitable to curtail power flow on a transmission corridor, the transactions already scheduled may be curtailed with immediate effect by the Regional Load Despatch Centre (keeping in view the transaction which is likely to …
- 11.2. Comments have been received from SRPC and OTPC. › 14.3. Analysis and Decision… The Detailed Procedure for Allocation of Transmission Corridor for Scheduling of General Network Access and Temporary General Network Access "Allocation of Corridor" issued under the GNA Regulations dated 29.9.2023 provides as follows: …
3 matching passages in this document