Skip to content

Search the library

Filters
Year
—

Showing the best matches for “energy storage obligation”: 9 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.

The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.

  1. CERC · Procedure · Dated 29 Sep 2023 · Transmission

    Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023

    3 matching passages in this document

  2. TSERC · Procedure · Dated 30 Nov 2024 · Open Access

    Procedure of verification of status of CGP, 2024

    3 matching passages in this document

  3. CERC · Procedure · Renewable Energy

    Revised Procedure for Grant of Connectivity to Projects based on Renewable Sources to ISTS

    3 matching passages in this document

  4. PSERC · Procedure · Dated 19 Apr 2023 · Generation

    Banking Facility for Solar Captive Power Plants Order, 2023

    3 matching passages in this document

  5. CERC · Procedure · Renewable Energy

    Detailed Procedure for Grant of Connectivity to Renewable Projects to ISTS

    3 matching passages in this document

  6. TNERC · Procedure · Dated 6 Jun 2024 · Renewable Energy

    RE Curtailment Management Procedure for Wind and Solar Generation, 2024

    3 matching passages in this document

  7. TNERC · Procedure · Open Access

    Procedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014

    3 matching passages in this document

  8. TNERC · Procedure · Open Access

    Procedure for Grant of Connectivity to the Intra-State Transmission System

    3 matching passages in this document

  9. TSERC · Draft procedure · Released with the notice dated 30 Sep 2024 · Generation

    Draft Procedure for Verification of Captive Status of Generating Plants in Telangana

    Draft