MERC · Maharashtra Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation Procedure, 2018
Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation
ProcedureDated 7 Dec 2018MERC/Open Access/ MSLDC/1300/2018 dated 7th December, 2018
Made under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
On 7 December 2018 MERC wrote to the Chief Engineer, MSLDC, approving the procedure MSLDC had submitted on 15 November 2018 for implementing forecasting, scheduling and deviation settlement for solar and wind generation (p1). The approved text follows as an MSLDC-prepared procedure under the MERC (Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation) Regulations, 2018 (p2).
Section 1 makes it applicable to wind and solar generators in Maharashtra connected to the intra-state transmission system, including pooling-substation generators and projects using power for self-consumption or sale within or outside the State, with a combined or individual capacity threshold of not less than 5 MW, and temporarily excludes solar projects under Mukhyamantri Sour Krishivahini Yojana (p4).
Sections 2–6 set out who may be a QCA, its technical and financial eligibility, its duties, generator and MSLDC duties, and registration/de-registration procedure (pp4–13). Sections 7–8 cover MSLDC fees and charges and communication/SCADA protocol (pp13–15). Section 9 details forecasting and scheduling, including time-block forecasts, revisions and worked cases for distribution- and transmission-level interconnection (pp15–21).
Sections 10–11 set weekly energy and deviation accounting, using SEM data and state-periphery WRPC DSM bills (pp21–23). Section 12 is the core methodology: pooling substations are classified; intra-state deviation charges use an absolute-error table and a virtual pool for state-periphery impact; inter-state transactions are settled separately under the CERC framework and handled in FBSM as an interim arrangement (pp23–31). Section 13 gives the payment mechanism, late-payment surcharge and corpus. Sections 14–17 cover default, grievance, removal of difficulties, general conditions and an eight-week trial run before commercial settlement (pp31–34). Section 18 and annexures provide formats for authorization, forecasts, telemetry, registration, technical data, PPA affidavit, indemnity and payment summary (pp35–49).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 20 Jul 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Statement of Reasons
- Dated 18 Mar 2019Notification of Effective Date for Commercial Arrangement under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 3 Jul 2024Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Dated 18 Mar 2019Removal of Difficulty in implementation of Procedure under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 19 Dec 2019Amended F&S Procedure for Solar and Wind Generation
- Dated 19 Apr 2021Removal of Difficulty in Applicability of State Periphery Charges under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Order, 2021
Earlier drafts
- Released with the notice dated 27 Feb 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft
- Dated 27 Feb 2018Public notice: Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Public Notice Inviting Comments
- Released with the notice dated 27 Feb 2018File: Draft Solar and Wind Forecasting, Scheduling and Deviation Settlement Framework for Maharashtra, 2018 — Approach Paper
- Dated 21 Dec 2023Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — First Amendment, 2023 — Draft
- Released with the draft dated 21 Dec 2023Explanatory memorandum: Explanatory Memorandum on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
- Dated 22 Dec 2023Public notice: Public Notice on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.