Removal of Difficulty in Applicability of State Periphery Charges under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Order, 2021

Removal of Difficulty in applicability of State Periphery Charges under the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018

OrderDated 19 Apr 2021

Made under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a suo motu order of the Maharashtra Electricity Regulatory Commission dated 19 April 2021, issued in exercise of the Commission's removal-of-difficulty power under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018, known as the F&S Regulations (p1, p8).

The question is whether State Periphery Charges — the charge derived from solar and wind deviation as reflected at the State periphery under Regulation 12.1(d) — can be levied on RE generators through their QCAs. Paras 1 to 4 set out the history: the F&S Regulations were notified on 20 July 2018 and commercially implemented from 6 January 2020; RE developers petitioned for an extra trial period and complained of unclear periphery-charge computation; litigation is pending before the High Court and APTEL; and by Order dated 12 August 2020 the Commission had, as an interim measure, directed MSLDC to bill only PSS-level charges and to defer the periphery component (p1–3).

Paras 6 to 10 summarise the DSM Working Group's report on 29 weeks of RE DSM bills (6 January to 26 July 2020): deviation-error analysis on sample PSSs, the extent of under-injection, and a four-scenario framework (State over/under-drawal against RE over/under-injection) that governs when periphery charges are shared with RE generators. The Working Group found MSLDC's computation to be in line with the Regulations. On Issue 1, the Commission accepts the recommendation to continue the deferment of State Periphery Charges until further directions (p6–8). On Issue 2, it directs that charges already collected be adjusted against the same generators' future PSS-level liability through their QCAs (p8–9). Paras 14 to 16 record grid-level improvements, direct the Working Group to keep monitoring, and commit to reviewing the matter once the DSM Regulations, 2019 are commercially implemented (p9–10).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Deviation settlement (DSM), Scheduling and despatch

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document