MERC · Maharashtra Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018
RegulationDated 20 Jul 2018No. MERC/Admin / Regulation / 2018 / 107.– dated 20th July, 2018
1 amendment to it is on Voltaic, dated 3 Jul 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's 2018 regulation creating the state-level framework for forecasting, scheduling and deviation settlement for solar and wind generators connected to the intra-state transmission system. It is notification No. MERC/Admin/Regulation/2018/107, issued from Mumbai and dated 20 July 2018 (p13, p23).
Pages 13–15 carry the preliminary provisions. Regulation 1 brings the regulations into force from Gazette publication, with a carve-out: Regulation 5.14 and the whole of Part C, plus the related deviation charge and penalty provisions, commence only on a date to be notified separately, not later than nine months later. Regulation 2 defines the working vocabulary — Absolute Error, Available Capacity, deviation, de-pooling, pooling sub-station, QCA, State DSM Pool Account, time block and others (p13–15).
Part A (Regulations 3–4) states the objective — grid integration of solar and wind while preserving system security, with the SLDC using week-ahead, day-ahead and intra-day forecasts — and settles applicability: all wind and solar generators in Maharashtra connected to the intra-state transmission system, including those pooling, for self-consumption or sale inside or outside the State, with a floor of not less than 5 MW of combined or individual installed capacity (p15). It also commits the Commission to review the regulations after two years.
Part B (Regulations 5–6) is the Forecasting and Scheduling Code. It requires generators at a pooling sub-station to appoint a QCA by 51% of capacity, treats the QCA as a State Entity registered with the SLDC, fixes its duties — metering data, aggregation, scheduling, de-pooling, settlement — and details the day-ahead, week-ahead and one-and-a-half-hourly revision cycle, the option to adopt the SLDC's forecast, and a penalty regime for mis-declared Available Capacity (p15–18). Much of the mechanics is left to an SLDC Detailed Procedure (p17–18).
Part C (Regulations 7–9) is the commercial core that is deferred: deviation charges for intra-state sale or self-consumption by absolute-error band, paid through the SLDC into the Pool Account, plus separate treatment of generators selling or consuming outside Maharashtra (p19–20). Part D (Regulations 10–16) covers metering, energy accounting, QCA–SLDC communication, billing and payment with a late-payment surcharge, curtailment intimation and de-pooling (p20–22). Part E (Regulations 17–19) reserves practice directions and amendment / removal-of-difficulty powers (p22–23). The Annexure sets the deviation charge framework for out-of-state generation, keyed to PPA rates or the national APPC, with monthly REC netting at pool level (p24–25).
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 20 Jul 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Statement of Reasons
- Dated 18 Mar 2019Notification of Effective Date for Commercial Arrangement under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 3 Jul 2024Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Dated 7 Dec 2018Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation Procedure, 2018
- Dated 18 Mar 2019Removal of Difficulty in implementation of Procedure under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 19 Dec 2019Amended F&S Procedure for Solar and Wind Generation
- Dated 19 Apr 2021Removal of Difficulty in Applicability of State Periphery Charges under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Order, 2021
Earlier drafts
- Released with the notice dated 27 Feb 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft
- Dated 27 Feb 2018Public notice: Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Public Notice Inviting Comments
- Released with the notice dated 27 Feb 2018File: Draft Solar and Wind Forecasting, Scheduling and Deviation Settlement Framework for Maharashtra, 2018 — Approach Paper
- Dated 21 Dec 2023Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — First Amendment, 2023 — Draft
- Released with the draft dated 21 Dec 2023Explanatory memorandum: Explanatory Memorandum on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
- Dated 22 Dec 2023Public notice: Public Notice on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.