Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018

RegulationDated 20 Jul 2018No. MERC/Admin / Regulation / 2018 / 107.– dated 20th July, 2018

1 amendment to it is on Voltaic, dated 3 Jul 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Maharashtra Electricity Regulatory Commission's 2018 regulation creating the state-level framework for forecasting, scheduling and deviation settlement for solar and wind generators connected to the intra-state transmission system. It is notification No. MERC/Admin/Regulation/2018/107, issued from Mumbai and dated 20 July 2018 (p13, p23).

Pages 13–15 carry the preliminary provisions. Regulation 1 brings the regulations into force from Gazette publication, with a carve-out: Regulation 5.14 and the whole of Part C, plus the related deviation charge and penalty provisions, commence only on a date to be notified separately, not later than nine months later. Regulation 2 defines the working vocabulary — Absolute Error, Available Capacity, deviation, de-pooling, pooling sub-station, QCA, State DSM Pool Account, time block and others (p13–15).

Part A (Regulations 3–4) states the objective — grid integration of solar and wind while preserving system security, with the SLDC using week-ahead, day-ahead and intra-day forecasts — and settles applicability: all wind and solar generators in Maharashtra connected to the intra-state transmission system, including those pooling, for self-consumption or sale inside or outside the State, with a floor of not less than 5 MW of combined or individual installed capacity (p15). It also commits the Commission to review the regulations after two years.

Part B (Regulations 5–6) is the Forecasting and Scheduling Code. It requires generators at a pooling sub-station to appoint a QCA by 51% of capacity, treats the QCA as a State Entity registered with the SLDC, fixes its duties — metering data, aggregation, scheduling, de-pooling, settlement — and details the day-ahead, week-ahead and one-and-a-half-hourly revision cycle, the option to adopt the SLDC's forecast, and a penalty regime for mis-declared Available Capacity (p15–18). Much of the mechanics is left to an SLDC Detailed Procedure (p17–18).

Part C (Regulations 7–9) is the commercial core that is deferred: deviation charges for intra-state sale or self-consumption by absolute-error band, paid through the SLDC into the Pool Account, plus separate treatment of generators selling or consuming outside Maharashtra (p19–20). Part D (Regulations 10–16) covers metering, energy accounting, QCA–SLDC communication, billing and payment with a late-payment surcharge, curtailment intimation and de-pooling (p20–22). Part E (Regulations 17–19) reserves practice directions and amendment / removal-of-difficulty powers (p22–23). The Annexure sets the deviation charge framework for out-of-state generation, keyed to PPA rates or the national APPC, with monthly REC netting at pool level (p24–25).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document