MERC · Maharashtra Electricity Regulatory Commission

Amended F&S Procedure for Solar and Wind Generation

Amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation

ProcedureDated 19 Dec 2019

Made under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 41 of 68. Check the regulator's original before you rely on it.

This is MSLDC's amended procedure for implementing the MERC Forecasting, Scheduling and Deviation Settlement (F&S) framework for solar and wind generation in Maharashtra. It was prepared by MSLDC and approved by MERC on 19 December 2019, and is expressed to be in accordance with the MERC F&S Regulations, 2018 and the Commission's Common Order dated 30.09.2019 (p1, p3). It applies to wind and solar generators connected to the intra-State transmission system, including through pooling sub-stations and for self-consumption or sale within or outside the State, with a minimum capacity threshold of 5 MW and an exemption for Mukhyamantri Sour Krishivahini Yojana projects (p3).

After the outline and applicability, the procedure sets qualifying criteria for a QCA — an Indian company appointed by generators at a pooling sub-station, with at least 51% authorization, technical and financial capability, and an indemnity bond (p4–5). It then allocates roles and responsibilities across the QCA, generators, MSLDC, distribution licensees and STU/transmission licensees: control centre and communication obligations, forecasting and scheduling submissions, data and metering, registry maintenance, demand forecast for sub-5 MW embedded generation, nodal officers, and enforcement actions for non-compliance (p5–14).

The next block covers registration and de-registration: online QCA registration with processing fee and corpus, a fallback where 51% authorization is unavailable, a special methodology for 33 kV distribution licensee pooling sub-stations of 5–20 MW, and three de-registration routes — own de-registration, non-authorization by generators, and default — with notice periods and corpus refund provisions (p14–23).

Operationally, the procedure specifies MSLDC fees and charges, communication protocol and SCADA/IEC-104 integration (p23–24), forecasting and scheduling timelines including day-ahead and week-ahead forecasts, revisions, and case-by-case forecast/scheduling points for intra-State and inter-State sales (p24–30). It sets a curtailment protocol notwithstanding must-run status, with curtailment instructions effective from the fourth time block and outage notification requirements (p30–32), then meter data acquisition without AMR, energy accounting including hybrid pooling and weekly deviation accounts, deviation accounting against WRPC DSM bills, and the deviation-charge methodology with Table-1 error bands and State-periphery apportionment scenarios (p32–41). Sections 18–23 — payment mechanism, compliance monitoring, grievance redressal, removal of difficulties, general provisions, and annexures/formats.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.