Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2024 — Statement of Reasons

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) (First Amendment) Regulations, 2024

Statement of reasonsDated 3 Jul 2024

The commission's reasons for the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 30 of 51. Check the regulator's original before you rely on it.

This is MERC's Statement of Reasons for the First Amendment to its 2018 Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind. It explains why the Commission is moving from actual-generation-based to scheduled-generation-based settlement, and records the public consultation and final decisions (p1–3). Sections 1–2 cover enabling provisions and transition mechanics: scheduled settlement provisions will start on a date to be notified separately, not later than 15 months after the amendment, with a 3-month preparatory period and a 12-month Trial Mode in parallel with existing actual-generation settlement (p4–7). Sections 3–4 define Contract rate and Trial Mode and add detailed trial-mode operating rules, including mock DSM bills, no recovery of trial deviation bills, SLDC/MSPC reporting, and a difficulty-removal power (p7–11). Section 5 brings MSKVY agricultural solar projects into the regulations, but defers their applicability to a notified date; it directs distribution licensees to plan for a Distribution System Operator/control centre and MSEDCL to report metering compliance (p11–15). Sections 6–13 address review periodicity aligned to the MYT Control Period, QCA metering/data duties, real-time visibility, contract-wise rather than individual-generator scheduling, schedule revision limits, updated Detailed Procedure and re-submission during trial, and mis-declaration of Available Capacity (p15–28). Section 14 sets the scheduled-generation settlement proviso for intra-state sales, and section 15 begins revision of deviation-settlement provisions for intra-state transactions. Overall, the SoR is the decision record behind the amendment and is useful for mapping stakeholder objections to final regulatory choices.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.