Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — First Amendment, 2023 — Draft

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) (First Amendment) Regulations, 2023

Draft amendmentDated 21 Dec 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft pre-publication notification of the Maharashtra Electricity Regulatory Commission's First Amendment to its 2018 Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind generation (p1). It is issued under the Electricity Act 2003 and is to come into force on Gazette publication; the Gazette date is not printed (p1). The amendment is built around a planned move from actual-generation settlement to scheduled-generation settlement, with a parallel trial run (p2).

Clause 3 inserts provisos into Regulation 1.2. The scheduled-generation settlement provisions — proviso to Regulation 7.1, Regulation 7.2B, proviso to Regulation 13.1, proviso to Regulation 16 and related provisions — are deferred to a separately notified date, no later than fifteen months after the amendment is notified. Until then, those arrangements are to run in parallel at pooling substations in Trial Mode from three months after notification, for twelve months or such period as the Commission decides (p2).

Clause 4 adds definitions of Area Clearing Price, Contract rate, Gaming and Trial Mode, and substitutes the State Deviation Pool Account definition (p2–3). Clause 5 makes the Commission's review of absolute error bands annual (p3). Clause 6 revises the forecasting and scheduling code: QCA duties, individual and aggregated forecasts and schedules, SLDC's dynamic web-based application, schedule revision rules, updated Detailed Procedure timelines, monitoring of declared Available Capacity, penalties for misdeclaration and cancellation of QCA registration, and a Gaming investigation process (p3–6).

Clause 7 introduces the commercial split between actual-generation and scheduled-generation settlement, with tables for deviation charges on under- and over-injection, contract-rate affidavits, and deletes Regulation 7.6 (p6–10). Clause 8 addresses inter-state transactions at pooling substations and the interface with CERC's deviation settlement regime (p10). Clauses 9–12 cover metering, web-based IT platforms, QCA de-pooling and payment responsibilities, and continuation of the Maharashtra State Power Committee (p10–13). Clause 13 substitutes the Annexure tables and adds APPC/REC treatment for captive and open-access generators (p13–16). The text is dated 21 December 2023 (p16).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document