MERC · Maharashtra Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Statement of Reasons
Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 – Statement of Reasons
Statement of reasonsDated 20 Jul 2018
The commission's reasons for the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 or one of its amendments.
Summary
Summary written by software, from pages 1 to 26 of 37. Check the regulator's original before you rely on it.
This Statement of Reasons (SoR) accompanies MERC's 2018 Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind generation, dated 20 July 2018 (p1). It explains why the Commission framed the F&S Regulations after public consultation: a notice was published on 28 February 2018 with comments due 31 March 2018, and 35 entities responded (p1–2). The stated objective is large-scale grid integration of solar and wind while maintaining grid stability through forecasting, scheduling and commercial deviation settlement (p2).
The document is organised issue-by-issue. For each draft regulation, it gives the draft text, comments received, the Commission's analysis and the final provision. Issues 1–3 retain the enabling provisions under the Electricity Act, defer commencement of the commercial arrangement to a separate order within nine months, and decline to add definitions of REMC, Existing Project and New Project (p2–4). Issues 4–8 deal with definitions and formulas: the Commission adopts an Absolute Error formula using Available Capacity as denominator, modifies Available Capacity to be as declared by the generator or QCA, revises Scheduled Drawal to MW or MWh, and retains the inter-connection point and procurer definitions (p4–7).
Issue 10 retains applicability to wind and solar generators connected to the Intra-State Transmission System, including through pooling substations, with a 5 MW minimum combined or individual threshold, and rejects exemptions for old projects or lower-CUF wind generators (p8–10). Issues 11–16 cover QCA appointment, state entity status, registration, de-pooling and settlement duties, real-time and weather data, and CEA-compliant metering with SLDC's detailed procedure (p10–14). Issues 17–22 provide that schedules are aggregated only up to pooling substation level; a virtual pool is only for deviation computation, not scheduling; day-ahead and week-ahead schedules are retained; and schedule revisions remain at 1.5-hour intervals up to 16 per day (p14–19).
Issues 23–25 extend SLDC's detailed procedure to three months with stakeholder consultation, say scheduling provisions prevail over the MERC Transmission Open Access Regulations, 2016 for non-firm RE, and retain mis-declaration penalties and registration cancellation (p19–21). Issue 26 changes QCA appointment approval to at least 51% of generators by installed capacity (p21–23). Issues 27–29 adopt Available Capacity-based error bands, retain QCA-to-SLDC settlement rather than discom billing, and route generators selling outside Maharashtra to CERC DSM with SLDC accounting for intra-state impact (p23–26).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 18 Mar 2019Notification of Effective Date for Commercial Arrangement under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 3 Jul 2024Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Dated 7 Dec 2018Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation Procedure, 2018
- Dated 18 Mar 2019Removal of Difficulty in implementation of Procedure under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 19 Dec 2019Amended F&S Procedure for Solar and Wind Generation
- Dated 19 Apr 2021Removal of Difficulty in Applicability of State Periphery Charges under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Order, 2021
Earlier drafts
- Released with the notice dated 27 Feb 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft
- Dated 27 Feb 2018Public notice: Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Public Notice Inviting Comments
- Released with the notice dated 27 Feb 2018File: Draft Solar and Wind Forecasting, Scheduling and Deviation Settlement Framework for Maharashtra, 2018 — Approach Paper
- Dated 21 Dec 2023Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — First Amendment, 2023 — Draft
- Released with the draft dated 21 Dec 2023Explanatory memorandum: Explanatory Memorandum on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
- Dated 22 Dec 2023Public notice: Public Notice on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.