Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Statement of Reasons

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 – Statement of Reasons

Statement of reasonsDated 20 Jul 2018

The commission's reasons for the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 37. Check the regulator's original before you rely on it.

This Statement of Reasons (SoR) accompanies MERC's 2018 Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind generation, dated 20 July 2018 (p1). It explains why the Commission framed the F&S Regulations after public consultation: a notice was published on 28 February 2018 with comments due 31 March 2018, and 35 entities responded (p1–2). The stated objective is large-scale grid integration of solar and wind while maintaining grid stability through forecasting, scheduling and commercial deviation settlement (p2).

The document is organised issue-by-issue. For each draft regulation, it gives the draft text, comments received, the Commission's analysis and the final provision. Issues 1–3 retain the enabling provisions under the Electricity Act, defer commencement of the commercial arrangement to a separate order within nine months, and decline to add definitions of REMC, Existing Project and New Project (p2–4). Issues 4–8 deal with definitions and formulas: the Commission adopts an Absolute Error formula using Available Capacity as denominator, modifies Available Capacity to be as declared by the generator or QCA, revises Scheduled Drawal to MW or MWh, and retains the inter-connection point and procurer definitions (p4–7).

Issue 10 retains applicability to wind and solar generators connected to the Intra-State Transmission System, including through pooling substations, with a 5 MW minimum combined or individual threshold, and rejects exemptions for old projects or lower-CUF wind generators (p8–10). Issues 11–16 cover QCA appointment, state entity status, registration, de-pooling and settlement duties, real-time and weather data, and CEA-compliant metering with SLDC's detailed procedure (p10–14). Issues 17–22 provide that schedules are aggregated only up to pooling substation level; a virtual pool is only for deviation computation, not scheduling; day-ahead and week-ahead schedules are retained; and schedule revisions remain at 1.5-hour intervals up to 16 per day (p14–19).

Issues 23–25 extend SLDC's detailed procedure to three months with stakeholder consultation, say scheduling provisions prevail over the MERC Transmission Open Access Regulations, 2016 for non-firm RE, and retain mis-declaration penalties and registration cancellation (p19–21). Issue 26 changes QCA appointment approval to at least 51% of generators by installed capacity (p21–23). Issues 27–29 adopt Available Capacity-based error bands, retain QCA-to-SLDC settlement rather than discom billing, and route generators selling outside Maharashtra to CERC DSM with SLDC accounting for intra-state impact (p23–26).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.