Draft Solar and Wind Forecasting, Scheduling and Deviation Settlement Framework for Maharashtra, 2018 — Approach Paper
DRAFT REGULATIONS FOR FORECASTING, SCHEDULING AND DEVIATION SETTLEMENT FRAMEWORK FOR SOLAR AND WIND GENERATION IN MAHARASHTRA
Published with a draftReleased with the notice dated 27 Feb 2018
Draft
The draft has since been finalised as the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018.
Published with the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's February 2018 approach paper for draft regulations creating a state-level forecasting, scheduling and deviation-settlement framework for solar and wind generation (p1, p5). It is a consultation document: it explains why the framework is needed, reviews the national and FOR models, assesses Maharashtra's readiness, and sets out the design choices for the proposed regulations on which public comments are invited (p5, p6, p24, p33).
Chapter 1 sets the context: Maharashtra's growing wind and solar base is 'must run', variable and increasingly difficult for MSLDC to integrate without forecasts, schedules, metering and telemetry (p4–5). It explains the Commission's process and the national/state experience, including the deferred RRF, CERC's inter-state framework and the FOR's 2015 model regulations (p6). Chapter 2 summarises the CERC F&S framework, its QCA model and price vector, the FOR model regulations for states, and the FOR Technical Committee/SAMAST recommendations (p7–11).
Chapter 3 assesses Maharashtra: RE potential and installed capacity, pooling substations and metering points, MSLDC's SCADA/EMS and scheduling tools, existing energy accounting/banking/wheeling, the proposed REMC architecture, MSLDC's operational concerns, and the state's present UI deviation limit (p11–21). It notes that MSLDC currently lacks real-time visibility of much solar and wind generation and that REMC implementation is at DPR/working-group stage (p13–20).
Chapter 4 is the core design discussion for the proposed regulations. It covers the objective and scope; proposes no distinction between existing and new projects or between solar and wind; applies the framework at pooling-substation level or to stand-alone generators of 5 MW and above connected above 33 kV, excluding distributed/rooftop generation (p22–23). It examines two Absolute Error formulae — deviation as a percentage of Available Capacity or of Scheduled Generation — using one-year simulation data, and puts both options out for consultation (p24–28). It then discusses deviation charges and alternative bands/price vectors, and argues for a design that encourages forecasting without penalising unavoidable weather-driven variation (p28–33).
The remaining sections propose a single QCA per pooling substation, selected by the generators with a fallback based on largest installed-capacity support, and limited to scheduling/deviation settlement rather than all commercial settlement (p33–37). They set out a state Virtual Pool operated by MSLDC, de-pooling among generators on actual generation, recovery of any pool deficit from generators/QCAs rather than PSDF/NCEF, metering at the interconnection point, telemetry/communication obligations, an MSLDC detailed procedure, and separate handling of inter-state wheeling by state entities (p38–43).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 20 Jul 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Statement of Reasons
- Dated 18 Mar 2019Notification of Effective Date for Commercial Arrangement under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 3 Jul 2024Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Dated 7 Dec 2018Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation Procedure, 2018
- Dated 18 Mar 2019Removal of Difficulty in implementation of Procedure under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 19 Dec 2019Amended F&S Procedure for Solar and Wind Generation
- Dated 19 Apr 2021Removal of Difficulty in Applicability of State Periphery Charges under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Order, 2021
Earlier drafts
- Released with the notice dated 27 Feb 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft
- Dated 27 Feb 2018Public notice: Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Public Notice Inviting Comments
- Dated 21 Dec 2023Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — First Amendment, 2023 — Draft
- Released with the draft dated 21 Dec 2023Explanatory memorandum: Explanatory Memorandum on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
- Dated 22 Dec 2023Public notice: Public Notice on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.