Draft Solar and Wind Forecasting, Scheduling and Deviation Settlement Framework for Maharashtra, 2018 — Approach Paper

DRAFT REGULATIONS FOR FORECASTING, SCHEDULING AND DEVIATION SETTLEMENT FRAMEWORK FOR SOLAR AND WIND GENERATION IN MAHARASHTRA

Published with a draftReleased with the notice dated 27 Feb 2018

Published with the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Maharashtra Electricity Regulatory Commission's February 2018 approach paper for draft regulations creating a state-level forecasting, scheduling and deviation-settlement framework for solar and wind generation (p1, p5). It is a consultation document: it explains why the framework is needed, reviews the national and FOR models, assesses Maharashtra's readiness, and sets out the design choices for the proposed regulations on which public comments are invited (p5, p6, p24, p33).

Chapter 1 sets the context: Maharashtra's growing wind and solar base is 'must run', variable and increasingly difficult for MSLDC to integrate without forecasts, schedules, metering and telemetry (p4–5). It explains the Commission's process and the national/state experience, including the deferred RRF, CERC's inter-state framework and the FOR's 2015 model regulations (p6). Chapter 2 summarises the CERC F&S framework, its QCA model and price vector, the FOR model regulations for states, and the FOR Technical Committee/SAMAST recommendations (p7–11).

Chapter 3 assesses Maharashtra: RE potential and installed capacity, pooling substations and metering points, MSLDC's SCADA/EMS and scheduling tools, existing energy accounting/banking/wheeling, the proposed REMC architecture, MSLDC's operational concerns, and the state's present UI deviation limit (p11–21). It notes that MSLDC currently lacks real-time visibility of much solar and wind generation and that REMC implementation is at DPR/working-group stage (p13–20).

Chapter 4 is the core design discussion for the proposed regulations. It covers the objective and scope; proposes no distinction between existing and new projects or between solar and wind; applies the framework at pooling-substation level or to stand-alone generators of 5 MW and above connected above 33 kV, excluding distributed/rooftop generation (p22–23). It examines two Absolute Error formulae — deviation as a percentage of Available Capacity or of Scheduled Generation — using one-year simulation data, and puts both options out for consultation (p24–28). It then discusses deviation charges and alternative bands/price vectors, and argues for a design that encourages forecasting without penalising unavoidable weather-driven variation (p28–33).

The remaining sections propose a single QCA per pooling substation, selected by the generators with a fallback based on largest installed-capacity support, and limited to scheduling/deviation settlement rather than all commercial settlement (p33–37). They set out a state Virtual Pool operated by MSLDC, de-pooling among generators on actual generation, recovery of any pool deficit from generators/QCAs rather than PSDF/NCEF, metering at the interconnection point, telemetry/communication obligations, an MSLDC detailed procedure, and separate handling of inter-state wheeling by state entities (p38–43).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document