MERC · Maharashtra Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft
Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018
Draft regulationReleased with the notice dated 27 Feb 2018
Draft
A proposal that has since been finalised as the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A draft of the Maharashtra Electricity Regulatory Commission's framework for integrating wind and solar generation into the State grid through forecasting, scheduling and a deviation settlement mechanism. It sets out a complete regime — technical, commercial and implementation — and is issued for public comment, with two competing formulations printed side by side (p1, p8).
Preliminary and scope. Regulation 1 gives the title and a staged commencement: the substantive Parts begin on Gazette publication, but the bar on despatching unscheduled renewable generation (Reg 5.14) and the commercial/deviation-charge machinery in Part C are deferred by six months (p1). Regulation 2 defines the working vocabulary — Absolute Error, Available Capacity, Deviation, Pooling Sub-Station, Qualified Co-ordinating Agency, State Entity, time block and so on (p1–3). Part A states the objective — grid integration of wind and solar without compromising security, with the SLDC using forecasts and conventional-plant flexibility (p3) — and fixes applicability on wind and solar generators on the intra-State transmission system, including those at pooling sub-stations and those generating for self-consumption or sale, subject to a minimum combined capacity at the connection point (p4).
Part B is the Forecasting and Scheduling Code: appointment, registration and duties of the QCA as single point of contact and State Entity; aggregation of generator forecasts and schedules; day-ahead and week-ahead schedules across 15-minute blocks; intra-day revisions on a fixed clock; SLDC forecasting and recovery of its costs; scope and timelines for the SLDC's Detailed Procedure; and the penalty for intentional mis-declaration of Available Capacity (p4–7). Regulation 6 governs how generators appoint their QCA (p7).
Part C sets the commercial settlement: intra-State sale settled on actual generation but deviations charged through the QCA to the State DSM Pool, using percentage Absolute Error bands (p7–8); inter-State sale settled on schedule, with CERC's DSM framework governing consequences outside the State (p9); and separation of the two accounts (p10).
Part D covers metering (SEM), energy accounting, IT-enabled QCA–SLDC communication, computation of deviation charges at the State periphery, billing, a late-payment surcharge, curtailment intimation and de-pooling (p10–12). Part E gives practice-direction, amendment and removal-of-difficulty powers (p12–13). The Annexure provides a separate fixed-rate framework for generators selling or consuming power outside Maharashtra, including PPA/APPC rate selection and REC-based reconciliation of procurers' deemed RPO (p14–15).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 20 Jul 2018Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Statement of Reasons
- Dated 18 Mar 2019Notification of Effective Date for Commercial Arrangement under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 3 Jul 2024Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Dated 7 Dec 2018Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation Procedure, 2018
- Dated 18 Mar 2019Removal of Difficulty in implementation of Procedure under Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018
- Dated 19 Dec 2019Amended F&S Procedure for Solar and Wind Generation
- Dated 19 Apr 2021Removal of Difficulty in Applicability of State Periphery Charges under the Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Order, 2021
Earlier drafts
- Dated 21 Dec 2023Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — First Amendment, 2023 — Draft
- Released with the draft dated 21 Dec 2023Explanatory memorandum: Explanatory Memorandum on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
- Dated 22 Dec 2023Public notice: Public Notice on Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation (First Amendment) Regulations, 2023
- Dated 27 Feb 2018Public notice: Draft Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Public Notice Inviting Comments
- Released with the notice dated 27 Feb 2018File: Draft Solar and Wind Forecasting, Scheduling and Deviation Settlement Framework for Maharashtra, 2018 — Approach Paper
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.