MERC · Maharashtra Electricity Regulatory Commission

Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2018 — Draft

Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018

Draft regulationReleased with the notice dated 27 Feb 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A draft of the Maharashtra Electricity Regulatory Commission's framework for integrating wind and solar generation into the State grid through forecasting, scheduling and a deviation settlement mechanism. It sets out a complete regime — technical, commercial and implementation — and is issued for public comment, with two competing formulations printed side by side (p1, p8).

Preliminary and scope. Regulation 1 gives the title and a staged commencement: the substantive Parts begin on Gazette publication, but the bar on despatching unscheduled renewable generation (Reg 5.14) and the commercial/deviation-charge machinery in Part C are deferred by six months (p1). Regulation 2 defines the working vocabulary — Absolute Error, Available Capacity, Deviation, Pooling Sub-Station, Qualified Co-ordinating Agency, State Entity, time block and so on (p1–3). Part A states the objective — grid integration of wind and solar without compromising security, with the SLDC using forecasts and conventional-plant flexibility (p3) — and fixes applicability on wind and solar generators on the intra-State transmission system, including those at pooling sub-stations and those generating for self-consumption or sale, subject to a minimum combined capacity at the connection point (p4).

Part B is the Forecasting and Scheduling Code: appointment, registration and duties of the QCA as single point of contact and State Entity; aggregation of generator forecasts and schedules; day-ahead and week-ahead schedules across 15-minute blocks; intra-day revisions on a fixed clock; SLDC forecasting and recovery of its costs; scope and timelines for the SLDC's Detailed Procedure; and the penalty for intentional mis-declaration of Available Capacity (p4–7). Regulation 6 governs how generators appoint their QCA (p7).

Part C sets the commercial settlement: intra-State sale settled on actual generation but deviations charged through the QCA to the State DSM Pool, using percentage Absolute Error bands (p7–8); inter-State sale settled on schedule, with CERC's DSM framework governing consequences outside the State (p9); and separation of the two accounts (p10).

Part D covers metering (SEM), energy accounting, IT-enabled QCA–SLDC communication, computation of deviation charges at the State periphery, billing, a late-payment surcharge, curtailment intimation and de-pooling (p10–12). Part E gives practice-direction, amendment and removal-of-difficulty powers (p12–13). The Annexure provides a separate fixed-rate framework for generators selling or consuming power outside Maharashtra, including PPA/APPC rate selection and REC-based reconciliation of procurers' deemed RPO (p14–15).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document