Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fifth Amendment, 2026 — Statement of Reasons

Fifth Amendment to the Andhra Pradesh Electricity Regulatory Commission (Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric Line or Electrical Plant) Regulation, 2013 (Regulation No. 4 of 2013)

Statement of reasonsDated 30 Jul 2026Regulation No. 05 of 2026 dated 30.07.2026

The commission's reasons for the Licensee's Duty for Supply of Electricity on Request Regulation, 2013 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

APERC's Statement of Reasons bundled with the operative Fifth Amendment to the 2013 regulation that governs how distribution licensees must release supply on request and recover the cost of lines and plant. Pages 1-8 are the reasoning order: it records that DISCOMs asked for clarification on predetermined development charges, the meaning of "existing electrified network", the one-kilometre criterion, release of supply to group applications, apartments and commercial complexes, provision of DTRs, additional loads and execution of infrastructure works (p1-2); notes that the draft amendment and public notice issued on 06.05.2026 under s.181(3) (p2, p10); summarises objections from APEPDCL, APCPDCL, APSPDCL and two individuals (p3-4, p7); and sets out the Commission's analysis and modified text for each item.

Decision A (p3-4) settles the electrified-network definition by load size: LT connections up to 20 kW are measured against an LT line within a 1 km radial distance (extension subject to voltage regulation), while LT above 20 kW and HT 11 kV connections are measured against an 11 kV line within 1 km; houses built on agricultural land far from habitations are to be treated as farmhouses. It rejects APEPDCL's 500 m proposal and any urban/rural split. Decision B (pp4-5) covers aggregation of load for group applications, multi-storied buildings and apartments, the option of predetermined charges or estimated cost, the 150 kW cumulative-load ceiling above which only estimated cost applies, exclusion of commercial buildings from the estimated-cost option, and who may use turnkey execution. Decision C (p6) deletes the draft's separate 1 km applicability clause as redundant. Decision D (p6) permits a dedicated transformer for connected loads of 10 kW up to 20 kW at the consumer's cost.

Pages 10-13 are Annexure-II, the final amendment (Regulation No. 05 of 2026): it inserts the electrified-network, group-application and dedicated-transformer explanations at the end of Clause 7(1), and inserts new charging explanations at Clause 8.2 covering additional/new load where a dedicated DTR exists (Rs. 2,000/- per kW), where a DTR is newly needed (Rs. 12,600/- per kW, with a special rule tied to the one-year agreement period under Clause 5.9.3 of the GTCS), where the existing transformer is augmented, and where an HT consumer below 200 HP/150 kW moves to LT billing (Rs. 4,400/- per kW, or Rs. 12,600/- per kW if the DISCOM provides the DTR). It comes into force from the date of Gazette publication, not printed here (p11). Page 9 is Annexure-I, the list of objectors.

Standard name
Duty to Supply on Request, Recovery of Expenditure and Miscellaneous Charges
Primary topics
New connections and load changes, Connection and miscellaneous charges, Supply to buildings and colonies

Read with this

Consolidated copies, for reference (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document