APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Duty for Supply on Request and Recovery of Expenses, 2013 — Fifth Amendment, 2026 — Draft
Fifth Amendment to the Andhra Pradesh Electricity Regulatory Commission (Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric line or Electrical Plant) Regulation, 2013 (Regulation No. 4 of 2013)
Draft amendmentDated 6 May 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
APERC proposes, in draft, the Fifth Amendment to its Regulation No. 4 of 2013 on licensees' duty to supply electricity on request and recovery of expenses for providing electric lines and plant (p1). The background (p1–2) records the Fourth Amendment (Regulation No. 4 of 2025), which simplified service release charges for connections up to 150 kW within 1 km of the electrified network, and the difficulties that followed: clarification letters from APSPDCL, APCPDCL and APEPDCL on the 1 km limit, group applications and additional loads involving dedicated distribution transformers, plus a CREDAI Andhra Pradesh representation on the burden borne by apartment consumers.
Clause 1 (p2) names the amendment, extends it to the whole State and ties commencement to publication in the Andhra Pradesh Gazette. Clause 2 (pp2–3) inserts Explanations at the end of Clause 7(1): what counts as an "electrified network" for LT and 11 kV HT connections and the 1 km radial limit on service line length; how loads are aggregated for group applications in the same premises; the choice open to multi-storied buildings and apartments between Regulation charges and estimated cost, and the mandatory estimated-cost route once cumulative load exceeds 150 kW; and the conditions under which a consumer below 20 kW may install a dedicated transformer.
Clause 3 (pp3–4) adds Explanations to clause 8.2 specifying per-kW charges for additional load in three situations — spare capacity in an existing dedicated DTR, a new DTR, and augmentation of an existing DTR — with any recovery exceeding the differential transformer cost adjusted in later bills. The document closes with the Commission's order at Kurnool (p4).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 29 Jan 2015Metering Practice Directions, 2015
- Dated 24 Feb 2025Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013 — Third Amendment, 2025 — Statement of Reasons
- Dated 11 Jul 2025Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Statement of Reasons
- Dated 30 Jul 2026Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fifth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.