APERC · Andhra Pradesh Electricity Regulatory Commission

Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Draft

Fourth Amendment to the Andhra Pradesh Electricity Regulatory Commission (Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric line or Electrical Plant) Regulation, 2013 (Regulation No. 4 of 2013)

Draft amendmentDated 30 May 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Andhra Pradesh Electricity Regulatory Commission has published a draft Fourth Amendment to its 2013 regulation on licensees' duty to supply electricity on request and to recover the cost of providing electric line or electrical plant (p1). The draft is signed at Kurnool on 30.05.2025 by the Commission Secretary (i/c), with the regulation number left blank (p5). The Background (pp1–2) gives the trigger: clause 4(13) of the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 and requests from APEPDCL, APSPDCL and APCPDCL to release LT supply up to 150 kW without site-by-site estimation, supported by average-cost-of-connection data the licensees filed during 2024.

Clause 1 names the amendment, extends it to Andhra Pradesh, brings it into force on Gazette publication, and provides that load limits for new or additional LT and HT load in documents such as the GTCS and the Retail Supply Tariff Order stand corrected to match it (pp2–3).

Clause 2 inserts a proviso after clause 7(1) of the principal regulation fixing a FY 2025-26 schedule of service-line charges, including development charges, for new or additional connections up to 150 kW within a 1 km radius of the electrified network (p3). The table sets charges by tariff category (LT-I domestic, LT-II non-domestic/commercial, LT-III and IV, and 11 kV HT) and by contracted-load slab. A further proviso keeps the application fee and security deposit payable under other regulations, and another exempts connections beyond 1 km, electrification of layouts, the agricultural and related category, and underground cables (p4). From FY 2026-27, licensees must propose the next schedule with their ARR and FPT filings by 30 November, or separately; the Commission aims to order within 120 days, and the FY 2025-26 charges continue if no proposal is filed (p4).

Clause 3 disapplies Annexure-I's schedule of development charges for the covered consumers; clause 4 replaces clause 8.4, requiring dedicated transformers for LT non-agricultural consumers above 20 kW and barring supply from such a transformer to any other consumer; clause 5 adds clauses 13–15 on removing difficulties, issuing orders and practice directions, and amendment (pp4–5).

Standard name
Duty to Supply on Request, Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Conditions of supply

Read with this

Consolidated copies, for reference (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.