Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Consolidated

Andhra Pradesh Electricity Regulatory Commission (Licensee's duty for supply of electricity on request) Regulation, 2013

Consolidated copyDated 31 Dec 2025Regulation No.4 of 2013

A consolidated copy of the Licensee's Duty for Supply of Electricity on Request Regulation, 2013, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's consolidated Regulation No. 4 of 2013 on a distribution licensee's duty to supply electricity on request and its right to recover what it spends on providing electric lines and plant, as amended up to the Fourth Amendment of 11-07-2025 (p1). It replaces Regulation No. 3 of 2004, which the Commission had partly deleted by a common order of 24-08-2005; the High Court set that deletion aside on 05-10-2010 and directed a fresh regulation under section 46 (p2). A draft was consulted on, with a public hearing on 17-06-2013 (p3).

Clauses 1–2 give the short title, commencement on Gazette publication and the defined terms; clause 3 extends the regulation to distribution and transmission licensees, open access users and all consumers connected or seeking connection in Andhra Pradesh (p6). Clause 4 is the operative core: the duty to supply on request, acknowledgement and charge-intimation deadlines, and separate supply-release timelines for LT, HT and EHT service; a waiting-list and annual-target regime for LT agricultural connections; Commission-approved timelines where a new 33/11 kV or EHT substation is required; and carve-outs for delays beyond the licensee's control or in unelectrified habitations (p7–10). Clause 5 makes default punishable by penalty while preserving compensation under section 57(2) (p10); clause 6 authorises recovery of reasonably incurred expenditure and apportions common line costs among applicants (p10–11).

Clauses 7–9 set the money and data rules: service line charges, with a schedule for connections up to 150 kW within 1 km for FY2025-26, exemptions, and the route to future charge approvals; mandatory smart metering; development charges on a shallow normative basis with a replacement of the annexed schedule (p18–19) and rules for category change, splitting and temporary supply; and annual cost data books (p11–16). Clauses 10–15 cover accounting of recoveries against gross fixed assets, force majeure, savings for other consumer rights, and the Commission's powers to remove difficulties, issue orders and practice directions, and amend (p16–17).

Standard name
Duty to Supply on Request, Recovery of Expenditure and Miscellaneous Charges
Primary topics
New connections and load changes, Connection and miscellaneous charges, Agricultural supply

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document