APERC · Andhra Pradesh Electricity Regulatory Commission
Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Third Amendment, 2025 — Draft
Third Amendment to Andhra Pradesh Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Regulation, 2013 (Regulation No.4 of 2013)
Draft amendmentDated 1 Jan 2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amending regulation — the third — to the APERC (Licensee's Duty for Supply of Electricity on Request) Regulation, 2013 (Regulation No.4 of 2013), the instrument that fixes a distribution licensee's obligation to supply electricity on request.
The introduction (p1–2) traces the lineage of the Principal Regulation: gazetted on 29.07.2013, adopted by the newly constituted APERC for the residual State of Andhra Pradesh w.e.f. 01.08.2014 through the APERC (Adaptation) Regulation, 2014, and amended twice (gazettes of 29.11.2014 and 31.12.2021). It then sets out why the Commission is acting: CEA's 2019 and 2022 amendments to the CEA (Installation and Operation of Meters) Regulations, 2006 — which mandate smart meters with prepayment features for new and existing consumers, address connections above the IS-specified current-carrying capacity, and permit prepayment meters in areas without a communication network subject to SERC approval — and MoP notifications of 17.08.2021 fixing replacement timelines. Requests from APDISCOMs for consequential changes to the General Terms and Conditions of Supply are also recorded.
Clause 1 (p2) names the instrument, extends it to the whole of Andhra Pradesh and provides that it comes into force on the date of publication in the AP Gazette. Clause 2 (p2–3) substitutes Clause 7(2) of the Principal Regulation: the licensee's duty to provide a meter is restated as an obligation to install a smart meter conforming to the CEA metering regulations, with a display unit, two-way communication, AMI and AMR compatibility, and a built-in security mechanism against code theft. The substituted clause also allocates meter and allied equipment cost between licensee and consumer and governs whether meter rent may be collected. The draft is signed at Kurnool on 01.01.2025 (p3).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 29 Jan 2015Metering Practice Directions, 2015
- Dated 24 Feb 2025Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013 — Third Amendment, 2025 — Statement of Reasons
- Dated 11 Jul 2025Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Statement of Reasons
- Dated 30 Jul 2026Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fifth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.