APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Statement of Reasons
Fourth Amendment to the Andhra Pradesh Electricity Regulatory Commission (Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric line or Electrical Plant) Regulation, 2013 (Regulation No. 4 of 2013)
Statement of reasonsDated 11 Jul 2025Regulation No.4 of 2025 dated 11.07.2025
The commission's reasons for the Licensee's Duty for Supply of Electricity on Request Regulation, 2013 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is APERC's Statement of Reasons and Order accompanying the Fourth Amendment to Regulation No. 4 of 2013, the regulation on licensees' duty to supply electricity on request and recover expenses for providing electric lines or electrical plant. Pages 1-2 give the rationale — predetermined connection charges for releases up to 150 kW are expected to benefit consumers and make doing business easier by removing the need for field inspections — reproduce the draft proviso proposed to be inserted after Clause 7(1), and note the public notice of 30.05.2025 inviting stakeholder comments.
Pages 3-4 record the objections. A member of the public questioned the undisclosed cost basis, the overlap with fixed charges already billed, and the disparity between LT charges above 20 kW and HT charges in the 75-150 kW range. APSPDCL sought clarification of the "1 km radius" wording, raised revenue-loss concerns for connections below 20 kW, and pointed out that the FY2025-26 Retail Supply Tariff Order specifies no LT tariff for non-industrial consumers in the 75-150 kW range. The Commission explains that the charges are derived from actual service-release expenditure of the three DISCOMs over past years, that they are service line charges under Section 46 of the Electricity Act and not part of fixed charges, and that HT consumers bear DTR and associated infrastructure costs themselves. It directs DISCOMs to report actual expenditure against approved charges in their annual ARR & FPT filings, and states the draft is modified on two of the suggestions.
Pages 5-8 carry the Annexure: the operative Regulation No. 4 of 2025. It sets out short title, extent and commencement on Gazette publication, and provides that category-wise LT/HT load limits in documents such as the GTCS or RSTO stand corrected to match the amendment. It inserts the charge proviso after Clause 7(1) for connections up to 150 kW within 1 km of the electrified network (maximum service line length one km) for FY 2025-26, with a tariff-wise schedule of charges, an application fee and security deposit saved by the relevant regulation, and a list of exemptions. It adds a proviso that Annexure-I development charges do not apply to these consumers, replaces Clause 8.4 on dedicated transformers for LT consumers (other than agriculture) above 20 kW, and inserts new clauses 13-15 on removal of difficulties, issue of orders and practice directions, and power to amend. It also lays down how licensees are to propose service line charges from FY 2026-27 onwards, with a 120-day timeline for the Commission's order and continuation of the FY 2025-26 charges if no proposal is filed.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 29 Jan 2015Metering Practice Directions, 2015
- Dated 24 Feb 2025Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013 — Third Amendment, 2025 — Statement of Reasons
- Dated 30 Jul 2026Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fifth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2025Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Third Amendment, 2025 — Draft
- Dated 30 May 2025Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Draft
- Dated 6 May 2026Licensees' Duty for Supply on Request and Recovery of Expenses, 2013 — Fifth Amendment, 2026 — Draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.