APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013 — Third Amendment, 2025 — Statement of Reasons
Third Amendment to the Andhra Pradesh Electricity Regulatory Commission (Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric Line or Electrical Plant) Regulation, 2013 (Regulation No. 4 of 2013)
Statement of reasonsDated 24 Feb 2025Regulation No.1 of 2025 dated 24-02-2025
The commission's reasons for the Licensee's Duty for Supply of Electricity on Request Regulation, 2013 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is APERC's statement of reasons and annexed final regulation for the Third Amendment to the APERC (Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses for Providing Electric Line or Electrical Plant) Regulation, 2013 (Regulation No.4 of 2013), issued as Regulation No.1 of 2025 and dated 24-02-2025 (p1, p13). It addresses who installs and pays for consumer smart meters.
Pages 1–2 set the background: CEA amendments in 2019 and 2022 to the Metering Regulations require smart meters, and a Ministry of Power notification dated 17.08.2021 sets replacement timelines. APDISCOMs asked APERC to amend its regulations; APERC published a draft third amendment with a common public notice on 01.01.2025, initially inviting comments by 22.01.2025 and later extending the deadline to 29.01.2025.
Pages 3–10 are the statement of reasons on the proposed substitution of Clause 7(2). The Commission reproduces the draft clause, which requires distribution licensees to provide smart meters with two-way communication and AMI/AMR compatibility, and allows either the licensee or the consumer to bear meter and allied equipment cost. Objectors—including a former APERC secretary, consumer groups and Prayas—argued that the change would violate Sections 55 and 47(5) of the Electricity Act, that prepaid meters cannot be forced, that the MoP/CEA lack authority, and that consumers would face extra cost. APERC rejects these objections: it says the amendment concerns smart meter installation, not mandatory prepaid billing; consumers retain the option to buy their own meter; and the Commission must align with CEA Metering Regulations under Section 55(1) read with Section 177(2)(c). It lists asserted smart-meter benefits and declines to issue separate meter-ownership directions.
Pages 11–12 are Annexure-I, listing the objectors. Pages 13–14 are Annexure-II, the final amended regulation: short title, extent to Andhra Pradesh, commencement on Gazette publication, and the substituted Clause 7(2) on smart meter installation and cost recovery. The Gazette date is not printed (p13).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 29 Jan 2015Metering Practice Directions, 2015
- Dated 11 Jul 2025Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Statement of Reasons
- Dated 30 Jul 2026Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fifth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2025Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Third Amendment, 2025 — Draft
- Dated 30 May 2025Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Draft
- Dated 6 May 2026Licensees' Duty for Supply on Request and Recovery of Expenses, 2013 — Fifth Amendment, 2026 — Draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.