APERC · Andhra Pradesh Electricity Regulatory Commission

Licensee's Duty for Supply of Electricity on Request Regulation, 2013

Andhra Pradesh Electricity Regulatory Commission (Licensee's duty for supply of electricity on request) Regulation, 2013

RegulationDated 19 Jul 2013Published in the Gazette 29 Jul 2013Regulation No.4 of 2013 dated 19-07-2013

2 amendments to it are on Voltaic, the latest dated 31 Dec 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's 2013 regulation on two connected things: a distribution licensee's duty to give supply on request, and its right to recover the cost of the line and plant built to do so (p1–2). It replaces APERC Regulation No.3 of 2004, after the Commission's 2005 order deleting clauses 5–11 of that regulation was declared non-est by the High Court, which directed a fresh regulation (p1). The draft was published for comments and a public hearing was held on 17-06-2013 (p1). It took effect on Gazette publication, 29 July 2013 (p1–2).

The definitions clause fixes the vocabulary — supply voltage bands (LT, HT, EHT), feeder types (dedicated, express), service line, distribution main and the point of commencement of supply, with separate rules for LT and HT installations (p2–3). Clause 3 states the regulation applies to distribution licensees, transmission licensees, open access users and all connected or connecting consumers in the State (p3).

Clause 4 is the operative core: acknowledgement and charge-intimation timelines, release-of-supply timelines that lengthen with voltage, the special treatment of LT agricultural connections against an annual release target with a serial waiting list, the route to the Commission where a new 33/11 kV or EHT substation is needed, coordination and reimbursement between distribution and transmission licensees, lapse of an application if charges are unpaid, and carve-outs for clearances, right of way and land (p3–5). Clause 5 makes default penalisable by the adjudicating officer without displacing compensation under the standards-of-performance regime (p5). Clauses 6 to 8 deal with recovery of expenditure, service line charges and development charges — apportionment across applicants sharing a common line, meter cost and meter rent, transformer ownership in commercial complexes and apartments, and treatment of temporary supply, category change and splitting of service (p5–6). Clauses 9 to 12 cover the annual cost data book, accounting of recoveries against gross fixed assets, force majeure, and savings for consumer rights under other law (p6). Annexure-I sets out the schedule of development charges by tariff category (p7).

Standard name
Duty to Supply on Request, Recovery of Expenditure and Miscellaneous Charges
Primary topics
New connections and load changes, Connection and miscellaneous charges, Agricultural supply

Read with this

Consolidated copies, for reference (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.