APERC · Andhra Pradesh Electricity Regulatory Commission
Metering Practice Directions, 2015
Metering issues – Location, Ownership, Cost Recovery Mechanism and Responsibilities of Licensees/Generating Companies
OrderDated 29 Jan 2015APERC/1/2015
Read with the Licensee's Duty for Supply of Electricity on Request Regulation, 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a set of Practice Directions issued by the Andhra Pradesh Electricity Regulatory Commission (No. APERC/1/2015, dated 29-01-2015) to resolve practical difficulties that licencees and generators raised while implementing the metering regime under Section 55 of the Electricity Act, 2003 (p1). The Directions are expressed as a running commentary: for each issue the Commission extracts the relevant clause of the CEA (Installation and Operation of Meters) Regulations, 2006 (and the 2010 amendment) or the CERC Open Access in Inter-State Transmission Regulations, 2008 series, states its analysis, and then issues a binding directive.
Applicability is to generating companies and licencees engaged in generation, transmission, distribution and supply, and to all open access consumers in Andhra Pradesh (p2).
The Directions settle four clusters of issues. First, ownership: suppliers (the generating company or licencee from whose system power flows) own and maintain interface meters, with the licencee owning meters where the consumer is connected to its system (p2–3). Second, cost and installation of interface meters for open access users: the STU or distribution licencee procures and installs at the intra-state entity's cost, must quote cost within seven days and complete installation within one month of full payment, or alternatively recover an approved monthly meter rent (p3–4). Third, meter testing: licencees must obtain NABL accreditation for their laboratories, test accuracy without charging consumers, but may charge a consumer who asks for testing in his own interest (p4–5). Fourth, location: generating stations install main, check and standby meters on outgoing feeders and on the HV side of generator and auxiliary transformers (p5); for open access and scheduled consumers, main, check and standby meters sit at the consumer's premises, with standby meters mandatory for new HT open access services from 28-02-2015 and not insisted on for existing HT services facing space constraints (p5–6).
On dedicated feeders the Commission finds clause 2(f) of APERC Regulation No. 4 of 2013 (Licensee's duty for supply of electricity on request) inconsistent with the Tariff Order and GTCS, and decides to delete clause 2(f) and clause 7(3), with the formal amendments to follow (p6).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 24 Feb 2025Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013 — Third Amendment, 2025 — Statement of Reasons
- Dated 11 Jul 2025Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Statement of Reasons
- Dated 30 Jul 2026Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fifth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2025Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Third Amendment, 2025 — Draft
- Dated 30 May 2025Licensees' Duty for Supply on Request and Recovery of Expenses Regulation, 2013 — Fourth Amendment, 2025 — Draft
- Dated 6 May 2026Licensees' Duty for Supply on Request and Recovery of Expenses, 2013 — Fifth Amendment, 2026 — Draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.