Multi Year Tariff Regulations, 2015 — Second Amendment, 2017 — Statement of Reasons

Statement of Reasons for Draft UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017

Statement of reasonsDate not stated

Replaced by Multi Year Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Multi Year Tariff Regulations, 2015 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's Statement of Reasons for the draft UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017, signed by the Secretary (p1, p5). It is an explanatory document, not the amending notification itself: it explains why the Commission proposes to change one provision of the UERC Tariff Regulations, 2015 and reproduces the replacement text.

It records that the Principal Regulations were issued on 10 September 2015 and that they contained no O&M expense norms for F-Class machines, which were added by a first amendment notified 18 January 2017 (p1).

The substantive problem identified is a double incentive: Regulation 49(2) of the 2015 Regulations allows recovery of capacity charge (inclusive of incentive) scaled by achieved plant availability, so a generator earning above normative availability recovers more than approved AFC, while Regulation 49(4) separately pays 50 paise/kWh for generation above the normative plant load factor (p1–2). The Commission considers this a drafting anomaly it decided to correct (p4).

To justify the fix, it quotes CERC Tariff Regulations, 2014 — Regulation 30(2) for the capacity-charge formulae with month-on-month ceilings and Regulation 30(4) for the PLF-linked incentive (p2–3). It gives the policy reasoning that incentive should follow actual generation/PLF rather than mere availability, since availability without despatch raises discom power-purchase cost without corresponding supply, and PAF-linked incentive weakens the generator's incentive to source alternate fuel (p3–4).

The document then sets out the proposed replacement of Regulation 49(2), using monthly cumulative capacity-charge formulae capped at the annual fixed cost, the same variable definitions, and the Renovation & Modernisation part-recovery proviso (p4–5). Readers should note the reproduced draft text and the quoted CERC provisions are the operative content.

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Generation tariff

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document