Multi Year Tariff Regulations, 2015 — Second Amendment, 2017 — Statement of Reasons
Statement of Reasons for Draft UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017
Statement of reasonsDate not stated
Replaced by Multi Year Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Multi Year Tariff Regulations, 2015 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons for the draft UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017, signed by the Secretary (p1, p5). It is an explanatory document, not the amending notification itself: it explains why the Commission proposes to change one provision of the UERC Tariff Regulations, 2015 and reproduces the replacement text.
It records that the Principal Regulations were issued on 10 September 2015 and that they contained no O&M expense norms for F-Class machines, which were added by a first amendment notified 18 January 2017 (p1).
The substantive problem identified is a double incentive: Regulation 49(2) of the 2015 Regulations allows recovery of capacity charge (inclusive of incentive) scaled by achieved plant availability, so a generator earning above normative availability recovers more than approved AFC, while Regulation 49(4) separately pays 50 paise/kWh for generation above the normative plant load factor (p1–2). The Commission considers this a drafting anomaly it decided to correct (p4).
To justify the fix, it quotes CERC Tariff Regulations, 2014 — Regulation 30(2) for the capacity-charge formulae with month-on-month ceilings and Regulation 30(4) for the PLF-linked incentive (p2–3). It gives the policy reasoning that incentive should follow actual generation/PLF rather than mere availability, since availability without despatch raises discom power-purchase cost without corresponding supply, and PAF-linked incentive weakens the generator's incentive to source alternate fuel (p3–4).
The document then sets out the proposed replacement of Regulation 49(2), using monthly cumulative capacity-charge formulae capped at the annual fixed cost, the same variable definitions, and the Renovation & Modernisation part-recovery proviso (p4–5). Readers should note the reproduced draft text and the quoted CERC provisions are the operative content.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2015
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.