Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Formats for Transmission

OrderDate not stated

Replaced by Multi Year Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Multi Year Tariff Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a blank-formats compendium for transmission tariff petitions — the annexure of forms a transmission licensee fills in when filing its Aggregate Revenue Requirement, truing-up and investment plans before the Commission. Page 1 is an index listing 44 formats; pages 2–53 reproduce each as an empty template with column headings only, so nothing here fixes a value (p1–53).

The first group covers the ARR itself: Form 1 gives the summary ARR build-up (energy available and transmitted, revenue, expenditure, return on equity) (p2); Forms 2 and 2.2 build the equity base and additional RoE (p3–4); Forms 3–5 record transmission lines and substations asset-wise, transmission losses and the transmission availability factor (p5–7). Form 6 captures investment income, non-tariff income and income from other business under s.41 of the Electricity Act (p8), and Form 7 lists open-access related charges (p9).

The expense group — Form 8 with sub-forms 8.1 to 8.3 — breaks O&M into employee, repair & maintenance and administration & general expenses, with a separate employee headcount table (p10–13).

A large asset-and-cost group runs from Forms 9.1 to 9.B: gross fixed asset statements, assets funded through deposit works or capital subsidy/grant and their exclusion, element-wise project cost for transmission or communication systems, construction/supply/service package break-up, additional capitalisation after COD and its financing, incidental expenditure during construction and de-capitalisation (p14–29). Depreciation follows in Forms 10.1–10.2 (p30–32), then capital expenditure and capital works-in-progress in Forms 11.1–11.4 (p33–36).

Financing formats run from Form 12 (quarterly draw-down schedule for IDC and financing charges) through Form 13 (capital cost and financing structure), Forms 14/14.1 (financial packages up to COD), Forms 15.1–15.3 (loan statements and weighted-average and normative interest), Form 16 (interest and finance charges) and Form 17 (interest on working capital) (p37–47).

The closing group is planning and review: Forms 18 and 19 give proposed and actual investment plans; Form 20 summarises truing-up and annual performance review, separating controllable from uncontrollable variations; Forms 21.1–21.3 cover shunt capacitor addition/repair, electrical accidents and transformer failures (p48–53).

Primary topics
Transmission tariff, ARR and true-up, Tariff determination

Read with this

The regulation

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document