Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

SLDC Formats

Formats for SLDC

OrderDate not stated

Replaced by Multi Year Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Multi Year Tariff Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a collection of formats for the State Load Despatch Centre (SLDC) to use in regulatory filings, opening with an index of forms F-1 to F-13 (p1). It contains no operative clauses, standards or effective date; its function is to standardise how SLDC presents its aggregate revenue requirement (ARR), costs and financing to the Commission.

The first block covers the revenue requirement. Form F-1 summarises ARR by cost head — O&M, depreciation, interest, working capital interest, lease charges and return on equity — for the previous, current and ensuing years (p2). Form F-2 captures capital contributions, grants and subsidies (p3). Form F-3 summarises O&M expenses (p4), with Form F-3.1 detailing employee expenses and employee numbers (p5–6), administration and general expenses (p7), and repair & maintenance expenses by asset class (p8).

The asset and capital block then covers gross fixed assets (p9–10), asset-wise depreciation (p11–12), return on equity (p13), capital expenditure (p14), capital works-in-progress (p17), element-wise project cost (p18), incidental expenditure during construction (p21), draw-down schedule for IDC and financing (p23), capital cost and financing structure (p24), and financial packages (p25).

The financing and working-capital block covers outstanding loans (p26–28), weighted average interest on actual loans (p29), interest on normative loans (p30), working capital requirement (p31), the LDCD Fund (p32) and a three-year investment plan (p33). The notes require reconciliation with auditor certificates (p21) and explanations for deviations from UERC-approved or competent-authority-approved costs (p14, p25).

Primary topics
ARR and true-up, Capital cost and investment, Return, financing and working capital

Read with this

The regulation

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document