UERC · Uttarakhand Electricity Regulatory Commission
SLDC Formats
Formats for SLDC
OrderDate not stated
Replaced by Multi Year Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Multi Year Tariff Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a collection of formats for the State Load Despatch Centre (SLDC) to use in regulatory filings, opening with an index of forms F-1 to F-13 (p1). It contains no operative clauses, standards or effective date; its function is to standardise how SLDC presents its aggregate revenue requirement (ARR), costs and financing to the Commission.
The first block covers the revenue requirement. Form F-1 summarises ARR by cost head — O&M, depreciation, interest, working capital interest, lease charges and return on equity — for the previous, current and ensuing years (p2). Form F-2 captures capital contributions, grants and subsidies (p3). Form F-3 summarises O&M expenses (p4), with Form F-3.1 detailing employee expenses and employee numbers (p5–6), administration and general expenses (p7), and repair & maintenance expenses by asset class (p8).
The asset and capital block then covers gross fixed assets (p9–10), asset-wise depreciation (p11–12), return on equity (p13), capital expenditure (p14), capital works-in-progress (p17), element-wise project cost (p18), incidental expenditure during construction (p21), draw-down schedule for IDC and financing (p23), capital cost and financing structure (p24), and financial packages (p25).
The financing and working-capital block covers outstanding loans (p26–28), weighted average interest on actual loans (p29), interest on normative loans (p30), working capital requirement (p31), the LDCD Fund (p32) and a three-year investment plan (p33). The notes require reconciliation with auditor certificates (p21) and explanations for deviations from UERC-approved or competent-authority-approved costs (p14, p25).
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2015
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.