Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Formats for Distribution

OrderDate not stated

Replaced by Multi Year Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Multi Year Tariff Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 74 of 78. Check the regulator's original before you rely on it.

Page 1 is an index of 58 forms, F-1 to F-18.11, organised by financial schedules and performance metrics. It contains no substantive tariff norms, only blank tables and instructions; it is the reporting template a licensee must complete.

The first block covers ARR and power supply. Form F-1 (p2) summarises revenue requirement for previous, current and ensuing years. Forms F-2.1–F-2.9 (pp3–20) require monthly and category-wise forecasts of sales, consumer numbers, load, distribution losses, energy distribution, power availability, UI over/underdrawal, energy balance and power purchase expenses, with supporting agreements and basis notes. Form F-3 (p21) captures transmission and load dispatch charges.

Cost and capital reporting follows. Forms F-4–F-4.3 (pp22–25) detail O&M, employee, repair and maintenance and administrative expenses, plus headcount. Forms F-5.1–F-5.4 (pp26–31) cover gross fixed assets, depreciation, contributions, grants and subsidies. Forms F-6.1–F-6.10 (pp32–43) cover capital expenditure, capital works-in-progress, capital cost and financing structure, construction/supply/service package break-up, element-wise distribution asset cost, additional capitalisation, incidental expenditure during construction and decapitalisation. Forms F-7.1–F-7.5 (pp44–50) detail financial packages, drawdowns, outstanding loans, weighted average interest and normative loan interest.

Financing and revenue forms continue with F-8 (p51) working-capital interest, F-9 (p52) bad-debt provision, F-10 and F-10.1 (pp53–54) return on equity and additional RoE, F-11 (p55) non-tariff income and F-12 (pp56–57) wheeling income. Forms F-13 and F-14 (pp58–61) report revenue at existing and proposed tariffs, F-15 (p62) collection efficiency and F-16 (pp63–64) truing up, distinguishing controllable and uncontrollable deviations.

The performance block covers F-17.1–F-17.3 (pp65–67) SAIFI, SAIDI and MAIFI, calculated as per the UERC (Standards of Performance) Regulations, 2007, and F-18.1–F-18.7 (pp68–74) capacitor addition/repair, electrical accidents, feeder outages, load shedding, overloaded feeders, transformer failures and overloaded distribution transformers. The p1 index also lists F-18.8–F-18.11 for receivables ageing, metering, bill release and pending connections. No issue, Gazette or in-force date is printed; the forms are built around a multi-year control period with base year n and ensuing years up to n+3.

Primary topics
ARR and true-up, Tariff determination, Wheeling and retail supply tariff

Read with this

The regulation

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document