UERC · Uttarakhand Electricity Regulatory Commission
Formats for Distribution
OrderDate not stated
Replaced by Multi Year Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Multi Year Tariff Regulations, 2015.
Summary
Summary written by software, from pages 1 to 74 of 78. Check the regulator's original before you rely on it.
Page 1 is an index of 58 forms, F-1 to F-18.11, organised by financial schedules and performance metrics. It contains no substantive tariff norms, only blank tables and instructions; it is the reporting template a licensee must complete.
The first block covers ARR and power supply. Form F-1 (p2) summarises revenue requirement for previous, current and ensuing years. Forms F-2.1–F-2.9 (pp3–20) require monthly and category-wise forecasts of sales, consumer numbers, load, distribution losses, energy distribution, power availability, UI over/underdrawal, energy balance and power purchase expenses, with supporting agreements and basis notes. Form F-3 (p21) captures transmission and load dispatch charges.
Cost and capital reporting follows. Forms F-4–F-4.3 (pp22–25) detail O&M, employee, repair and maintenance and administrative expenses, plus headcount. Forms F-5.1–F-5.4 (pp26–31) cover gross fixed assets, depreciation, contributions, grants and subsidies. Forms F-6.1–F-6.10 (pp32–43) cover capital expenditure, capital works-in-progress, capital cost and financing structure, construction/supply/service package break-up, element-wise distribution asset cost, additional capitalisation, incidental expenditure during construction and decapitalisation. Forms F-7.1–F-7.5 (pp44–50) detail financial packages, drawdowns, outstanding loans, weighted average interest and normative loan interest.
Financing and revenue forms continue with F-8 (p51) working-capital interest, F-9 (p52) bad-debt provision, F-10 and F-10.1 (pp53–54) return on equity and additional RoE, F-11 (p55) non-tariff income and F-12 (pp56–57) wheeling income. Forms F-13 and F-14 (pp58–61) report revenue at existing and proposed tariffs, F-15 (p62) collection efficiency and F-16 (pp63–64) truing up, distinguishing controllable and uncontrollable deviations.
The performance block covers F-17.1–F-17.3 (pp65–67) SAIFI, SAIDI and MAIFI, calculated as per the UERC (Standards of Performance) Regulations, 2007, and F-18.1–F-18.7 (pp68–74) capacitor addition/repair, electrical accidents, feeder outages, load shedding, overloaded feeders, transformer failures and overloaded distribution transformers. The p1 index also lists F-18.8–F-18.11 for receivables ageing, metering, bill release and pending connections. No issue, Gazette or in-force date is printed; the forms are built around a multi-year control period with base year n and ensuing years up to n+3.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2015
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.