UERC · Uttarakhand Electricity Regulatory Commission
Multi Year Tariff Regulations, 2015 — Statement of Reasons
UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015
Statement of reasonsDated 10 Sep 2015
Replaced by Multi Year Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Multi Year Tariff Regulations, 2015 or one of its amendments.
Summary
Summary written by software, from pages 1 to 32 of 64. Check the regulator's original before you rely on it.
This is the Uttarakhand Electricity Regulatory Commission's Statement of Reasons (SoR) for the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015, dated 10 September 2015 (p1). It explains why the Commission finalised the regulations as it did, following the previous 2011 regulations' control period of 1 April 2013 to 31 March 2016, a consultation that closed on 30 June 2015, a State Advisory Committee meeting on 21 July 2015 and a public hearing on 18 August 2015 (p1). It is not the regulations themselves; the SoR states that the regulations prevail in case of any discrepancy (p1).
After the introduction, the SoR goes through the draft regulation clause by clause, setting out the draft text, stakeholder comments and the Commission's view. It covers the title and key definitions (p2–9) — accounting statement, additional capitalisation, beneficiary, contracted power (removed), control period (kept at three years, rejecting a five-year proposal), cut-off date, force majeure, generating unit, gross calorific value (only gas-based thermal units, not coal/lignite), long-term transmission customer, transmission loss and useful life. It then deals with business plan and trajectory provisions (p10–14), controllable parameters and the sharing of gains and losses (p14–17).
The middle part addresses capital cost and capitalisation — in-principle approval, additional capitalisation, interest during construction, incidental expenditure during construction, initial spares and asset replacement accounting (p18–26). It then covers return on equity and its differential rates (p26–28), lease charges (p28), bad and doubtful debts (p28–30), working capital for distribution and transmission (p30–32) and non-tariff income (p32). Many suggestions are rejected or deferred, some are accepted (for example, deleting the business-plan pre-approval clause and correcting a cross-reference), and some issues are left to later proceedings.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2015
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.