Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Multi Year Tariff Regulations, 2015 — Statement of Reasons

UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015

Statement of reasonsDated 10 Sep 2015

Replaced by Multi Year Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Multi Year Tariff Regulations, 2015 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 64. Check the regulator's original before you rely on it.

This is the Uttarakhand Electricity Regulatory Commission's Statement of Reasons (SoR) for the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015, dated 10 September 2015 (p1). It explains why the Commission finalised the regulations as it did, following the previous 2011 regulations' control period of 1 April 2013 to 31 March 2016, a consultation that closed on 30 June 2015, a State Advisory Committee meeting on 21 July 2015 and a public hearing on 18 August 2015 (p1). It is not the regulations themselves; the SoR states that the regulations prevail in case of any discrepancy (p1).

After the introduction, the SoR goes through the draft regulation clause by clause, setting out the draft text, stakeholder comments and the Commission's view. It covers the title and key definitions (p2–9) — accounting statement, additional capitalisation, beneficiary, contracted power (removed), control period (kept at three years, rejecting a five-year proposal), cut-off date, force majeure, generating unit, gross calorific value (only gas-based thermal units, not coal/lignite), long-term transmission customer, transmission loss and useful life. It then deals with business plan and trajectory provisions (p10–14), controllable parameters and the sharing of gains and losses (p14–17).

The middle part addresses capital cost and capitalisation — in-principle approval, additional capitalisation, interest during construction, incidental expenditure during construction, initial spares and asset replacement accounting (p18–26). It then covers return on equity and its differential rates (p26–28), lease charges (p28), bad and doubtful debts (p28–30), working capital for distribution and transmission (p30–32) and non-tariff income (p32). Many suggestions are rejected or deferred, some are accepted (for example, deleting the business-plan pre-approval clause and correcting a cross-reference), and some issues are left to later proceedings.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document