Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Formats for Thermal/Gas

OrderDate not stated

Replaced by Multi Year Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Multi Year Tariff Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

UERC's thermal/gas tariff filing format set. Page 1 is an index of 40 entries running from F-1.1 to F-13, with descriptions of each form. The forms then give the data structure a generating company must use when filing a tariff petition and true-up. F-1.1–F-1.2 (pp2–3) compute per-unit rate and summarise revenue and revenue requirement. F-2.1–F-2.3 (pp4–6) collect saleable energy, plant availability factor, monthly generation, and salient thermal-project features. F-3 (p7) calculates net annual fixed charges. F-4.1–F-4.2A (pp8–9) compute energy charges, fuel stocks, and gas fuel details. F-5.1–F-5.3 (pp10–15) present gross fixed asset base, financing plan, capital cost estimates, and depreciation. F-6.1–F-6.15A (pp16–35) cover capital expenditure, works-in-progress, COD schedules, cost and time overruns, actual cash expenditure, additional capitalisation, de-capitalisation, exclusions, and return on equity. F-7–F-8 (pp36–37) cover capital cost/financing structure and financial packages. F-9.1–F-9.3 (pp38–42) cover outstanding loans, weighted average interest, and normative-loan interest. F-10A (p43) gives gas-station working-capital interest. F-11–F-11.3 (pp44–47) break down O&M, R&M, employee and A&G expenses. F-12 (p48) collects non-tariff income. F-13 (p49) summarises truing up and annual performance review. No issuance date, notification number, or commencement clause appears.

Primary topics
Generation tariff, Tariff determination, ARR and true-up

Read with this

The regulation

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document