This is a set of blank filing formats for hydroelectric generating stations, listing 35 forms in an index on p1 and then reproducing each form as an empty table (p2–41). Each form is laid out as an annual time series: the previous year (n-1) as audited actuals, the current year (n) split into Apr–Sep actual and Oct–Mar estimated, and three ensuing years (n+1 to n+3) as projections (p2–3). A note fixes n as FY 2012-13 (p2, p3).
The opening forms cover the arithmetic of the tariff claim: per-unit rate of saleable energy and a summary of revenue against revenue requirement (F-1.1, F-1.2, p2–3). A second group deals with generation: saleable energy and plant availability factor, monthly energy generation, a long 'salient features' questionnaire on the hydro project (units, COD, beneficiaries, design energy, transmission, turbine/generator, dam, tunnels, penstock, switchyard), and a month-wise design-energy/MW-continuous sheet for run-of-river stations (F-2.1 to F-2.4, p4–8).
The core cost forms follow: computation of net annual fixed charges (F-3, p9); the gross fixed asset base and financing plan (F-4, p10–11); asset-wise and general depreciation statements (F-5.1, F-5.2, p12–14); and a large block on capital expenditure — capital expenditure, works-in-progress, COD schedule, break-ups of capital cost and of construction/supply/service packages at COD, IDC draw-down, additional capitalisation at the fag end of the project, de-capitalised assets, reconciliation of ACE with books, and incidental expenditure during construction (F-6.1 to F-6.11, p15–26). These carry notes requiring justification for time and cost overruns and for deviations from what UERC or other authorities approved.
The remaining forms cover capital cost and financing structure (F-7), financial packages (F-8), outstanding loans and interest computations including normative loans and working capital (F-9.1 to F-9.3, F-10), O&M expenses broken into repair, employee and administration heads (F-11 to F-11.3), non-tariff income (F-12), a truing-up summary with controllable/uncontrollable deviation columns for the previous year and a half-yearly performance review for the current year (F-13, p39), and return on equity (F-14, F-14A, p40–41).
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2015
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.