UERC · Uttarakhand Electricity Regulatory Commission
Multi Year Tariff Regulations, 2015
Multi Year Tariff Regulations, 2015 (English)
RegulationDate not stated
Replaced by Multi Year Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 33 of 106. Check the regulator's original before you rely on it.
This is the Uttarakhand Electricity Regulatory Commission’s multi-year tariff framework for the control period from 1 April 2016 to 31 March 2019 (p5, p16). It applies to generating companies, transmission licensees, distribution licensees and the SLDC for determination of generation, intra-State transmission, SLDC and retail supply tariffs and aggregate revenue requirements (p2). It excludes generating stations whose tariffs are discovered through competitive bidding adopted under section 63 and renewable-energy stations, which remain under separate UERC renewable-energy tariff regulations (p2). Reviews for periods before notification continue under the regulations then in force (p2).
Pages 3–15 are the definitional Part I, fixing meanings for accounting statements, ARR, capital cost, COD, control period, declared capacity, force majeure, prudence check, useful life and many other terms used throughout the framework.
Pages 16–29 are Part II, the MYT general principles. It requires a business plan for the whole control period by 30 November 2015 (p17), approval of baseline values (p17), a three-year control period (p16), ceiling norms (p16), trajectories for performance variables (p19), forecast ARR and expected revenue filings by 30 November of the preceding year (p20), annual performance review with truing-up and classification of variations into controllable and uncontrollable factors (p22–25), sharing of gains and losses (p25), annual tariff determination (p25–26), petition contents and forms (p26–28), a 120-day order timeline and publication/communication requirements (p28–29).
Pages 29–33 begin Part III, financial principles. It specifies how capital cost is determined for existing and new projects, what is included or excluded, in-principle approval for capital schemes, prudence check, treatment of interest during construction and incidental expenditure during construction, and delay consequences (pp29–33). Later parts are not available.
Read with this
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
3 more documents belong here and are not on Voltaic: 3 copies in another language.