UERC · Uttarakhand Electricity Regulatory Commission
Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Statement of Reasons
Statement of Reasons for the "UERC (Terms and Conditions for Determination of Multi Year Tariff) (First Amendment) Regulations, 2017"
Statement of reasonsDate not stated
Replaced by Multi Year Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Multi Year Tariff Regulations, 2015 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Uttarakhand Electricity Regulatory Commission's Statement of Reasons explaining why it amended Regulation 48(1) of its Multi Year Tariff Regulations, 2015 — the provision that sets normative O&M expenses for gas-based generating stations (p1). It records that two gas generators in the state, M/s Gama Infraprop Power Ltd. and M/s Sravanthi Energy Pvt. Ltd., had claimed higher O&M expenses than the Principal Regulations allowed because their stations use F-Class machines, for which the 2015 Regulations prescribed no norm at all; the Commission therefore proposed a first amendment to insert norms for Open Cycle Gas Turbine / Combined Cycle stations with Advanced F-Class machines (p1).
The consultation is documented: comments closed 02.01.2017 and a hearing was held 09.01.2017, with stakeholder and participant lists annexed (p1–2, p6–7). Substantively the Commission reproduces the comments — SEPL and Beta argued that F-Class turbines face higher thermal stresses, proprietary spares, OEM long-term service agreements and DLN combustion, and asked the Commission to follow CERC's Tariff Regulations, 2014, while the distribution licensee, UPCL, raised no objection (p2–3, p5).
The operative decision, given as eight numbered reasons, is to allow normative O&M expenses for Advanced F-Class machines as specified by CERC in its Tariff Regulations, 2014, citing CERC's own Statement of Reasons and the absence of local operating data for such plants (p3–5). Note the draft table at p2 shows the Commission's own proposed column for Advanced F-Class machines, which the final decision effectively displaces in favour of the CERC norms.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2015
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.