UERC · Uttarakhand Electricity Regulatory Commission
Terms and Conditions for Determination of Multi Year Tariff (Second Amendment) Regulations, 2017
UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2017
AmendmentDated 17 Jul 2017In force from 1 Apr 2017No. F-9(25)(II)/RG/UERC/2017/637 dated July 17, 2017
Replaced by Multi Year Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Multi Year Tariff Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page amendment by the Uttarakhand Electricity Regulatory Commission rewriting how capacity charges are paid to thermal generating stations under the state's multi-year tariff framework. It was issued on 17 July 2017 as Notification No. F-9(25)(II)/RG/UERC/2017/637, but it is declared to come into force from 01.04.2017, so it applies retrospectively to the year beginning on that date (p1).
The instrument is the second amendment to the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015, and it substitutes clause 2 of Regulation 49 of those principal regulations, along with amendments already made to them (p1). What replaces the clause is a run of twelve monthly capacity-charge formulae, CC1 through CC12 (p1–2). Each month's charge is built from the station's annual fixed cost, the plant availability factor achieved up to the end of that month, and the normative annual plant availability factor, and each is capped so that cumulative recovery through the year cannot exceed the AFC share attributable to that month — the ceiling being the year-to-date AFC fraction less everything already recovered.
A proviso covers stations or transmission elements under shutdown for renovation and modernisation: recovery of part of AFC is confined to O&M expenses and interest on loan (p2). The clause closes with definitions of AFC, NAPAF, the monthly and annual availability factors, and the twelve CC terms (p2).
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2015
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedFormats for Thermal/Gas
- Date not statedFormats for Distribution
- Date not statedFormats for Transmission
- Date not statedSLDC Formats
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.