HPERC · Himachal Pradesh Electricity Regulatory Commission

Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024

Petition under Regulation 14 of the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012 for approval of Schedule of Service Connection Charges, containing normative rates of Infrastructural Development Charges (IDC) to be recovered under sub-regulation (2) of Regulation 5 of the said Regulations.

OrderDated 5 Jun 2024Published in the Gazette 23 May 2012Petition No.: 22/2024 dated 05.06.2024

Made under the Recovery of Expenditure for Supply of Electricity Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is an HPERC order disposing of Petition No. 22/2024 filed by the Himachal Pradesh State Electricity Board Ltd. It approves a fresh schedule of service connection charges — the normative Infrastructure Development Charges (IDC) the distribution licensee may recover from applicants for a new connection or an increase in load (p1). The petition was filed under Regulation 14 of the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012, seeking approval of IDC rates under Regulation 5(2) of those regulations (p1).

Pages 1–4 set out the background: the 2012 IDC Regulations notified by Notification No. HPERC/419 dated 18.05.2012 and published in the Rajpatra on 23.05.2012; HPSEBL's proposal built on cost data for FY 2022-23 for connections released from FY 2023-24 onward; the rates then in force under the Tariff Order dated 31.03.2023; and the procedural steps — admission on 03.02.2024, newspaper publication, website hosting, a public notice inviting objections by 22.03.2024, and a public hearing at Shimla on 23.03.2024 (p1–5).

Pages 5–15 record objections and the licensee's replies, chiefly from industrial associations (BBNIA, CII, Parwanoo Industries Association and others) and the Consumer Representative, covering the basis of the normative rates, depreciation on IDC-funded assets, segregation of transmission assets, IDC surplus, T&D losses and employee costs, followed by the Commission's analysis at paras 16–20 (p5–17).

Paras 20–22 are operative. The Commission declines to reject the petition, accepts HPSEBL's justifications, and fixes normative IDC rates for FY 2024-25 in a simplified slab structure — separately for single-part tariff applicants by connected load (with a BPL domestic exemption) and for two-part tariff applicants by contract demand — with worked illustrations for part-load rounding, load enhancement and single-to-two-part conversion (p17–21). The rates apply to demand notices issued from the order date until 31.03.2025, and earlier demand notices are treated as final (p19–20). The order states these IDC rates exclude other charges recoverable separately under the 2012 Regulations (p21). Annexure-A lists the public hearing participants (p22).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, Capital cost and investment

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document