HPERC · Himachal Pradesh Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015
Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Second Amendment) Regulations, 2015
AmendmentDated 21 Sep 2015No. HPERC/419 dated the 21st September, 2015
Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's Second Amendment Regulations, 2015 (Notification No. HPERC/419, Shimla, 21 September 2015) rewrite the rebate rules for infrastructural development charges (IDC) where supply is taken again after a permanent disconnection. Made under s.46 read with s.181 of the Electricity Act, 2003, the amendment substitutes the third and fourth provisos to Regulation 10 of the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012 (pp1–2). The new third proviso lists four conditions — a similar connected load or contract demand and supply voltage, an application received within 365 days of permanent disconnection, Regulation 5(3) not being attracted, and clearance of outstanding dues including IDC on the old connection — and gives a 100% reduction of IDC worked out at normative rates on the lower of the originally sanctioned load/contract demand and the load applied for. The fourth proviso tapers that rebate by 5% for every 90 days or part after the 365-day window, and an Explanation walks the arithmetic through successive 90-day blocks until the rebate reaches zero (p2).
Pages 3–5 are the Commission's Order setting out why. It recalls the 2012 parent Regulations published on 23 May 2012, the earlier regime of a 60-day window with a 30-day taper, industry complaints that those timelines were too short and risked duplicate IDC, and the Commission's own view that Regulation 7(2)(ii)'s 365-day timeline sat awkwardly with Regulation 10's 60 days. The Commission records that it declined to link the rebate to what the original applicant actually deposited, notified the draft on 29 August 2015, published it in the Rajpatra and invited objections through two newspapers on 3 September 2015 under the Electricity (Procedure of Previous Publication) Rules, 2005; two industry associations replied with no objection but raised unrelated issues (pp3–5).
Read with this
The regulation
- Dated 18 May 2012Recovery of Expenditure for Supply of Electricity Regulations, 2012
Amendments and corrections
- Dated 22 Jul 2015Recovery of Expenditure for Supply of Electricity (First Amendment) Regulations, 2015
- Dated 19 Oct 2015Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015
- Dated 23 Jan 2017Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018
- Dated 5 Aug 2024Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Sixth Amendment, 2024
Commencement notices and reasons
- Dated 18 May 2012Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2017 — Order on draft amendments
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018 — Order
- Dated 3 Aug 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Finalisation Order
Procedures and orders made under it
- Dated 29 May 2012Fixation of Normative Infrastructure Development Charges, 2012 — Notification
- Dated 7 Jan 2013Normative Infrastructure Development Charges — Provisional Arrangements Extension, 2013
- Dated 5 Jun 2024Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024
Earlier drafts
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2016 — Draft
- Dated 20 Jul 2018Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fifth Amendment, 2018 — Draft
- Dated 22 May 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.