HPERC · Himachal Pradesh Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015

Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Second Amendment) Regulations, 2015

AmendmentDated 21 Sep 2015No. HPERC/419 dated the 21st September, 2015

Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's Second Amendment Regulations, 2015 (Notification No. HPERC/419, Shimla, 21 September 2015) rewrite the rebate rules for infrastructural development charges (IDC) where supply is taken again after a permanent disconnection. Made under s.46 read with s.181 of the Electricity Act, 2003, the amendment substitutes the third and fourth provisos to Regulation 10 of the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012 (pp1–2). The new third proviso lists four conditions — a similar connected load or contract demand and supply voltage, an application received within 365 days of permanent disconnection, Regulation 5(3) not being attracted, and clearance of outstanding dues including IDC on the old connection — and gives a 100% reduction of IDC worked out at normative rates on the lower of the originally sanctioned load/contract demand and the load applied for. The fourth proviso tapers that rebate by 5% for every 90 days or part after the 365-day window, and an Explanation walks the arithmetic through successive 90-day blocks until the rebate reaches zero (p2).

Pages 3–5 are the Commission's Order setting out why. It recalls the 2012 parent Regulations published on 23 May 2012, the earlier regime of a 60-day window with a 30-day taper, industry complaints that those timelines were too short and risked duplicate IDC, and the Commission's own view that Regulation 7(2)(ii)'s 365-day timeline sat awkwardly with Regulation 10's 60 days. The Commission records that it declined to link the rebate to what the original applicant actually deposited, notified the draft on 29 August 2015, published it in the Rajpatra and invited objections through two newspapers on 3 September 2015 under the Electricity (Procedure of Previous Publication) Rules, 2005; two industry associations replied with no objection but raised unrelated issues (pp3–5).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document