HPERC · Himachal Pradesh Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity Regulations, 2012
Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity ) Regulations, 2012
RegulationDated 18 May 2012No. HPERC/419 dated 18th May, 2012
6 amendments to it are on Voltaic, the latest dated 5 Aug 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission's 2012 notification replaces the 2005 regime governing what a distribution licensee in Himachal Pradesh may recover from an applicant when supplying electricity (p1). Made under section 46 read with section 181 of the Electricity Act, 2003, it applies to all distribution licensees in their respective licensed areas and takes effect on publication in the Rajpatra, Himachal Pradesh; the Gazette date is not printed (p1).
Regulations 3–5 are the core. Regulation 3 authorises recovery of expenses reasonably incurred in providing any electric line and the electrical plant used to give supply (p2). Regulation 4 deals with the service line — the cost of laying it plus terminal equipment and other arrangements, excluding the meter, CT and PT — and lets the Commission approve average or normative rates, or fixed per-kilometre rates, with temporary connections excluded unless specifically approved (p2–3). Regulation 5 covers the rest of the distribution system: a Commission-determined share of the cost of creation or augmentation of the system, recovered as infrastructural development charges at Commission-approved normative rates, with the methodology for deriving those rates set out in the provisos, and a separate route under sub-regulation (3) where an applicant or group in an area without adequate infrastructure must deposit the entire estimated cost of the works (p3–8). Sub-regulations (4)–(9) then deal with spare capacity, the original applicant's entitlements, refunds to original applicants when later applicants use their capacity, the redundancy allowance in determining spare capacity, separate treatment of EHT line and EHT substation components, and reconciliation of estimates against actuals (p5–8).
Regulations 6–10 handle particular cases: electrification of colonies and complexes sponsored by development agencies; additional loads, and reduction and later restoration of load; temporary supplies; withdrawal of an application before release of connection; and restoration of supply after permanent disconnection, including a sliding rebate on infrastructural development charges that depends on how soon the new application follows disconnection (p8–15). Regulations 11 and 12 make works paid for by the applicant the licensee's property and provide for departmental charges at a stated percentage of the cost of works (p15–16).
Regulations 13–15 set the cost-data and charges regime: an annual standard cost data book filed with the Commission and published to a fixed timetable, a schedule of service connection charges approved by the Commission after hearing interested parties, and provisional schedules of limited duration with interest payable on excess or deficit amounts (p16–19). Regulations 16–21 govern separate accounting of receipts under capital heads, who executes the works (including applicant-executed service lines through a licensed contractor), differential cost settlement, way-leaves and consents, manner of payment, and the demand notice and its treatment of pre-commencement demands (p19–22). Regulations 22–25 preserve the Commission's power to remove difficulties, issue practice directions and exercise inherent powers, and repeal the 2005 Regulations with savings (p22–23).
Read with this
Amendments and corrections
- Dated 22 Jul 2015Recovery of Expenditure for Supply of Electricity (First Amendment) Regulations, 2015
- Dated 21 Sep 2015Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015
- Dated 19 Oct 2015Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015
- Dated 23 Jan 2017Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018
- Dated 5 Aug 2024Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Sixth Amendment, 2024
Commencement notices and reasons
- Dated 18 May 2012Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2017 — Order on draft amendments
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018 — Order
- Dated 3 Aug 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Finalisation Order
Procedures and orders made under it
- Dated 29 May 2012Fixation of Normative Infrastructure Development Charges, 2012 — Notification
- Dated 7 Jan 2013Normative Infrastructure Development Charges — Provisional Arrangements Extension, 2013
- Dated 5 Jun 2024Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024
Earlier drafts
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2016 — Draft
- Dated 20 Jul 2018Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fifth Amendment, 2018 — Draft
- Dated 22 May 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.