Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Fourth Amendment) Regulations, 2016

Draft amendmentDated 9 Dec 2016No. HPERC/419. dated 9th December, 2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued this notification in Shimla on 9 December 2016 to place draft Fourth Amendment Regulations to its 2012 Recovery of Expenditure for Supply of Electricity Regulations before the public (p1). The recitals record that HPSEBL, the distribution licensee, was unable to implement the 2012 regulations cleanly because they were silent on recovering Infrastructural Development Charges where two or more connections are clubbed together, and that the Commission wants both to rationalise recovery for additional loads and to encourage consumers to move to higher voltages (p1).

The notification opens a 21-day window from its date for objections or suggestions, to be sent to the Secretary, HPERC at Khalini, Shimla, and notes that the draft text is also on the Commission's website (p1–2).

The draft has three regulations (p2–3). Regulation 1 names the amendment and ties commencement to publication in the Rajpatra, Himachal Pradesh. Regulation 2 rewrites regulation 7(1)(b) of the 2012 regulations: sub-clause (i) confines recovery of charges to the additional connected load or contract demand, and sub-clause (ii) governs clubbing of connections — allowed only where the connections stand in the same name at the same premises and at a voltage not below 11 kV and not below the Standard Supply Voltage for the combined load, with the combined load treated as the existing load for computing the addition. Provisos deny any refund where the existing load exceeds the combined load (deeming it surrendered), bar the Supply Code's temporary-reduction benefit for 365 days after a clubbed connection is released, and preserve the licensee's right to own and maintain the vacated service line. Regulation 2 also adjusts the opening words of regulation 7(2). Regulation 3 adds item (v) to the Third Proviso of regulation 10, disqualifying applicants who have permanently surrendered contract demand or connected load under the new regulation 7(1)(b)(ii).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Conditions of supply

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.