HPERC · Himachal Pradesh Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2016 — Draft
Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Fourth Amendment) Regulations, 2016
Draft amendmentDated 9 Dec 2016No. HPERC/419. dated 9th December, 2016
Draft
A proposal that has since been finalised as the Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission issued this notification in Shimla on 9 December 2016 to place draft Fourth Amendment Regulations to its 2012 Recovery of Expenditure for Supply of Electricity Regulations before the public (p1). The recitals record that HPSEBL, the distribution licensee, was unable to implement the 2012 regulations cleanly because they were silent on recovering Infrastructural Development Charges where two or more connections are clubbed together, and that the Commission wants both to rationalise recovery for additional loads and to encourage consumers to move to higher voltages (p1).
The notification opens a 21-day window from its date for objections or suggestions, to be sent to the Secretary, HPERC at Khalini, Shimla, and notes that the draft text is also on the Commission's website (p1–2).
The draft has three regulations (p2–3). Regulation 1 names the amendment and ties commencement to publication in the Rajpatra, Himachal Pradesh. Regulation 2 rewrites regulation 7(1)(b) of the 2012 regulations: sub-clause (i) confines recovery of charges to the additional connected load or contract demand, and sub-clause (ii) governs clubbing of connections — allowed only where the connections stand in the same name at the same premises and at a voltage not below 11 kV and not below the Standard Supply Voltage for the combined load, with the combined load treated as the existing load for computing the addition. Provisos deny any refund where the existing load exceeds the combined load (deeming it surrendered), bar the Supply Code's temporary-reduction benefit for 365 days after a clubbed connection is released, and preserve the licensee's right to own and maintain the vacated service line. Regulation 2 also adjusts the opening words of regulation 7(2). Regulation 3 adds item (v) to the Third Proviso of regulation 10, disqualifying applicants who have permanently surrendered contract demand or connected load under the new regulation 7(1)(b)(ii).
Read with this
The regulation
- Dated 18 May 2012Recovery of Expenditure for Supply of Electricity Regulations, 2012
Amendments and corrections
- Dated 22 Jul 2015Recovery of Expenditure for Supply of Electricity (First Amendment) Regulations, 2015
- Dated 21 Sep 2015Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015
- Dated 19 Oct 2015Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015
- Dated 23 Jan 2017Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018
- Dated 5 Aug 2024Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Sixth Amendment, 2024
Commencement notices and reasons
- Dated 18 May 2012Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2017 — Order on draft amendments
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018 — Order
- Dated 3 Aug 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Finalisation Order
Procedures and orders made under it
- Dated 29 May 2012Fixation of Normative Infrastructure Development Charges, 2012 — Notification
- Dated 7 Jan 2013Normative Infrastructure Development Charges — Provisional Arrangements Extension, 2013
- Dated 5 Jun 2024Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.