Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017

Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity)(Fourth Amendment)Regulations, 2017

AmendmentDated 23 Jan 2017No. HPERC/419 dated the 23rd January, 2017

Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page amendment notification issued by the Himachal Pradesh Electricity Regulatory Commission at Shimla on 23 January 2017 (p1). It amends the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012, and comes into force on the date of publication in the Rajpatra, Himachal Pradesh — the Rajpatra date itself is not printed (p1).

The operative part has three regulations. Regulation 1 gives the short title and commencement (p1). Regulation 2 rewrites regulation 7 of the principal regulations (p1–3): it substitutes sub-clauses (i) and (ii) of clause (b) of sub-regulation (1), which govern how supply-related charges are recovered where connected load or contract demand changes, and creates a regime for clubbing two or more existing connections of the same person into a single connection, subject to voltage and premises conditions and possibly different voltages. Three provisos attach: no refund where the existing load exceeds the combined load (the consumer is deemed to have surrendered the reduction), a bar on availing the Supply Code's temporary reduction in contract demand for a period after the new connection is released, and transfer of the vacated service line to the licensee. An Explanation defines how "person" and "premises" apply, expressly extending clubbing to holding and subsidiary companies and to contiguous premises. The same regulation also amends the opening words of regulation 7(2). Regulation 3 amends the Third Proviso to regulation 10, adding a new disqualifying item relating to permanent surrender of contract demand or connected load (p3).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document