HPERC · Himachal Pradesh Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017
Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity)(Fourth Amendment)Regulations, 2017
AmendmentDated 23 Jan 2017No. HPERC/419 dated the 23rd January, 2017
Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a three-page amendment notification issued by the Himachal Pradesh Electricity Regulatory Commission at Shimla on 23 January 2017 (p1). It amends the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012, and comes into force on the date of publication in the Rajpatra, Himachal Pradesh — the Rajpatra date itself is not printed (p1).
The operative part has three regulations. Regulation 1 gives the short title and commencement (p1). Regulation 2 rewrites regulation 7 of the principal regulations (p1–3): it substitutes sub-clauses (i) and (ii) of clause (b) of sub-regulation (1), which govern how supply-related charges are recovered where connected load or contract demand changes, and creates a regime for clubbing two or more existing connections of the same person into a single connection, subject to voltage and premises conditions and possibly different voltages. Three provisos attach: no refund where the existing load exceeds the combined load (the consumer is deemed to have surrendered the reduction), a bar on availing the Supply Code's temporary reduction in contract demand for a period after the new connection is released, and transfer of the vacated service line to the licensee. An Explanation defines how "person" and "premises" apply, expressly extending clubbing to holding and subsidiary companies and to contiguous premises. The same regulation also amends the opening words of regulation 7(2). Regulation 3 amends the Third Proviso to regulation 10, adding a new disqualifying item relating to permanent surrender of contract demand or connected load (p3).
Read with this
The regulation
- Dated 18 May 2012Recovery of Expenditure for Supply of Electricity Regulations, 2012
Amendments and corrections
- Dated 22 Jul 2015Recovery of Expenditure for Supply of Electricity (First Amendment) Regulations, 2015
- Dated 21 Sep 2015Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015
- Dated 19 Oct 2015Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018
- Dated 5 Aug 2024Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Sixth Amendment, 2024
Commencement notices and reasons
- Dated 18 May 2012Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2017 — Order on draft amendments
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018 — Order
- Dated 3 Aug 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Finalisation Order
Procedures and orders made under it
- Dated 29 May 2012Fixation of Normative Infrastructure Development Charges, 2012 — Notification
- Dated 7 Jan 2013Normative Infrastructure Development Charges — Provisional Arrangements Extension, 2013
- Dated 5 Jun 2024Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024
Earlier drafts
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2016 — Draft
- Dated 20 Jul 2018Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fifth Amendment, 2018 — Draft
- Dated 22 May 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.