Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015

Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Third Amendment) Regulations, 2015

AmendmentDated 19 Oct 2015Published in the Gazette 19 Sep 2015No. HPERC/419 dated the 19th October, 2015

Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's Third Amendment to its 2012 (Recovery of Expenditure for Supply of Electricity) Regulations, issued together with the Order that approved the draft (p1, pp3-5).

The operative change is a single clause. A fourth proviso is added to regulation 5(2) so that Infrastructure Development Charges are not recovered where an existing domestic supply connection in an individual's name is transferred, for a similar purpose, to a relative — whether on inheritance or at the existing consumer's specific request (p1). An Explanation says who counts as a relative (spouse, siblings on either side, lineal ascendants and descendants, and their spouses) (p1), and clarifies the position when the new consumer wants more load than was sanctioned to the original consumer: the extra expenditure is recovered under regulation 7, with additional security deposited at the rates fixed under the HPERC (Security Deposit) Regulations, 2005 (pp1-2).

The appended Order (pp3-5) records why the amendment was made: consumers complained about IDC on name transfers; the draft was notified on 18 September 2015 and published in the Rajpatra on 19 September 2015; objections were invited through two newspapers on 23 September 2015; and two stakeholders, HPSEB Limited and one individual, responded. The Commission calls HPSEB's suggestions not directly relevant but adds them as a clarifying explanation, refuses to make the amendment retrospective, and says the IDC concept itself is outside the scope of this amendment (pp4-5).

The regulations take effect from Rajpatra publication; that date is not printed (p1).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Security deposit

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document