HPERC · Himachal Pradesh Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015
Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Third Amendment) Regulations, 2015
AmendmentDated 19 Oct 2015Published in the Gazette 19 Sep 2015No. HPERC/419 dated the 19th October, 2015
Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Third Amendment to its 2012 (Recovery of Expenditure for Supply of Electricity) Regulations, issued together with the Order that approved the draft (p1, pp3-5).
The operative change is a single clause. A fourth proviso is added to regulation 5(2) so that Infrastructure Development Charges are not recovered where an existing domestic supply connection in an individual's name is transferred, for a similar purpose, to a relative — whether on inheritance or at the existing consumer's specific request (p1). An Explanation says who counts as a relative (spouse, siblings on either side, lineal ascendants and descendants, and their spouses) (p1), and clarifies the position when the new consumer wants more load than was sanctioned to the original consumer: the extra expenditure is recovered under regulation 7, with additional security deposited at the rates fixed under the HPERC (Security Deposit) Regulations, 2005 (pp1-2).
The appended Order (pp3-5) records why the amendment was made: consumers complained about IDC on name transfers; the draft was notified on 18 September 2015 and published in the Rajpatra on 19 September 2015; objections were invited through two newspapers on 23 September 2015; and two stakeholders, HPSEB Limited and one individual, responded. The Commission calls HPSEB's suggestions not directly relevant but adds them as a clarifying explanation, refuses to make the amendment retrospective, and says the IDC concept itself is outside the scope of this amendment (pp4-5).
The regulations take effect from Rajpatra publication; that date is not printed (p1).
Read with this
The regulation
- Dated 18 May 2012Recovery of Expenditure for Supply of Electricity Regulations, 2012
Amendments and corrections
- Dated 22 Jul 2015Recovery of Expenditure for Supply of Electricity (First Amendment) Regulations, 2015
- Dated 21 Sep 2015Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015
- Dated 23 Jan 2017Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018
- Dated 5 Aug 2024Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Sixth Amendment, 2024
Commencement notices and reasons
- Dated 18 May 2012Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2017 — Order on draft amendments
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018 — Order
- Dated 3 Aug 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Finalisation Order
Procedures and orders made under it
- Dated 29 May 2012Fixation of Normative Infrastructure Development Charges, 2012 — Notification
- Dated 7 Jan 2013Normative Infrastructure Development Charges — Provisional Arrangements Extension, 2013
- Dated 5 Jun 2024Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024
Earlier drafts
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2016 — Draft
- Dated 20 Jul 2018Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fifth Amendment, 2018 — Draft
- Dated 22 May 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.