Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons

Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) Regulations, 2012

Statement of reasonsDated 18 May 2012

The commission's reasons for the Recovery of Expenditure for Supply of Electricity Regulations, 2012 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This 21-page order of the Himachal Pradesh Electricity Regulatory Commission (HPERC), dated 18 May 2012, is the statement of reasons for finalising the HPERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2012. It records publication of the draft in the Rajpatra on 13 February 2012, newspaper notices on 15 February 2012, the 30-day objection window, and the State Advisory Committee meeting on 28 February 2012 (p1–2). Objections came from industry associations, HPSEBL, HPPCL and HPPTCL (p2–3). The Commission states that it will not apply the new Regulations retrospectively; past cases and pending applications are to be dealt with under the 2005 Regulations and its earlier order of 3 March 2012 (p3).

Paras 5–7 dispose general objections and definitions. The Commission declines to put service connection charges in the Supply Code, preferring a yearly Commission-approved schedule (p4). It expands the definition of “applicant”, deletes LT/HT definitions, and declines a separate IDC definition (p5).

Paras 8–12 address the core charges. For cost of service line (Regulation 4), the applicant bears the full dedicated cost; the licensee may adopt normative/average rates with approval, and an enabling provision allows per-km fixed rates for certain categories (p5–6). For IDC (Regulation 5), the Commission deletes draft clauses B, C and D to simplify, retains clauses A and E, and decides IDC will be on connected load for single-part tariff and contract demand for two-part tariff, with enabling provisions for rationalisation and ceilings (p6–12). It retains the five-year refund window under clause E and includes construction power for hydro projects (p12). For colonies/complexes (Regulation 6), builder refunds are retained (p12). For additional loads (Regulation 7), it replaces “rebate” with adjustment and adds protection where load is reduced and later restored within 365 days (p13–14). Temporary supply (Regulation 8) retains the disputed provisos (p14–15). Restoration after permanent disconnection (Regulation 10) widens the rebate window from 30 to 60 days (p15).

Paras 16–21 cover departmental charges (Regulations 12 and 17), annual cost data and the Schedule of Service Connection Charges (Regulations 13–14), execution of works by applicants (Regulation 17), manner of payment, and power to remove difficulties (Regulation 22). The Commission retains the existing higher departmental charge for exclusive works, fixes a lower rate for applicant-executed service lines, rejects turnkey exemptions, retains annual review with a 60-day filing window, and refuses instalment relief (p16–21). It orders formulation and publication of the Regulations in modified form (p21).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Supply to buildings and colonies

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.