Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fifth Amendment, 2018 — Draft

Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Fifth Amendment) Regulations, 2018

Draft amendmentDated 20 Jul 2018No. HPERC/419. dated 20th July, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This three-page notification of 20 July 2018 is HPERC's draft of the fifth amendment to its 2012 Recovery of Expenditure for Supply of Electricity Regulations, published for prior-publication consultation rather than as a made instrument (p1–2). The preamble and reasons come first, the draft text follows.

The preamble records the background: the 2012 regulations were published in the Rajpatra on 23 May 2012, and the distribution licensee HPSEBL proposed amending regulation 10 (restoration of supply after permanent disconnection) so that premises disconnected permanently — without any time duration — can be reconnected at the request of the same or a different consumer after completing Supply Code formalities, with all requisite charges payable except the normative IDC. The Commission says it wants to rationalise IDC recovery for such premises, and goes further than the proposal by extending similar treatment to consumers who permanently reduced sanctioned load or contract demand and later seek restoration, which requires amending regulation 7 as well (p1). The consultation notice gives objectors twenty-one days from the notification, points to the Commission's website and the Secretary's address, and fixes commencement at publication in the Rajpatra (p2).

Clause 1 names the regulations and the commencement rule (p2). Clause 2 rewords the opening words of regulation 7(2) so that the reduction-of-load provisions apply to reductions not attributed to clubbing of loads, and substitutes clause (ii) so that relief is conditional on the consumer clearing all billed outstanding dues, including the IDC payable at the time the original connection was released (p2). Clause 3 amends regulation 10: clause (ii) of the third proviso is omitted, clause (iv) is replaced by a condition that the applicant clear all dues on the original connection and on every earlier connection at the premises, including IDC of the permanently disconnected original connection; the fourth proviso and its explanation are dropped and the fifth proviso's cross-reference narrowed; two new explanations define "original connection" (measured by the load existing just before disconnection, disregarding temporary reductions under a Tariff Order) and make the new dues condition override the last sentence of sub-para 5.2.13 of the Himachal Pradesh Electricity Supply Code, 2009 (p3).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document