HPERC · Himachal Pradesh Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Finalisation Order
In the matter of draft amendments of the Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Sixth Amendment) Regulations, 2024.
OrderDated 3 Aug 2024Published in the Gazette 25 May 2024
Read with the Recovery of Expenditure for Supply of Electricity Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page HPERC order of 3 August 2024 that closes out the consultation on the draft HPERC (Recovery of Expenditure for Supply of Electricity) (Sixth Amendment) Regulations, 2024 and directs that the amendments be notified (p1–2). It is the finalisation record, not the amendment text: no change was made to the draft as published, and the operative wording sits in the notified regulations.
Paragraphs 1–3 set the background. The parent 2012 Regulations were gazetted on 23 May 2012 and have been amended from time to time. HPSEBL has prepared annual cost data books since 2006-07 and has gained sufficient experience; the Commission concluded that the period allowed for capturing the cost of material in those books needed rationalising, along with other need-based changes. The draft amendment was issued on 22 May 2024 and published in the Rajpatra on 25 May 2024 (p1).
Paragraph 4 records the pre-publication process: a public notice in Hindustan Times and Amar Ujala on 8 June 2024 under Rule 3 of the Electricity (Procedure of Previous Publication) Rules, 2005, the full draft on the Commission's website, and a last date of 6 July 2024 for objections and suggestions (p1). Paragraph 5 records letters of 11 June 2024 inviting Industries Associations, the State Government, the Directorate of Energy and the Distribution Licensee to respond (p1–2).
Paragraph 6 states that no comments were received within the stipulated period, repeats the rationale, approves the rationalisation, finalises the draft amendments without change and orders notification (p2). The order is signed by the Chairman and both Members and announced the same day (p2).
Read with this
The regulation
- Dated 18 May 2012Recovery of Expenditure for Supply of Electricity Regulations, 2012
Amendments and corrections
- Dated 22 Jul 2015Recovery of Expenditure for Supply of Electricity (First Amendment) Regulations, 2015
- Dated 21 Sep 2015Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015
- Dated 19 Oct 2015Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015
- Dated 23 Jan 2017Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018
- Dated 5 Aug 2024Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Sixth Amendment, 2024
Commencement notices and reasons
- Dated 18 May 2012Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2017 — Order on draft amendments
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018 — Order
Procedures and orders made under it
- Dated 29 May 2012Fixation of Normative Infrastructure Development Charges, 2012 — Notification
- Dated 7 Jan 2013Normative Infrastructure Development Charges — Provisional Arrangements Extension, 2013
- Dated 5 Jun 2024Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024
Earlier drafts
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2016 — Draft
- Dated 20 Jul 2018Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fifth Amendment, 2018 — Draft
- Dated 22 May 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.