Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018

Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Fifth Amendment) Regulations, 2018

AmendmentDated 5 Sep 2018No. HPERC/419. dated 5th September, 2018

Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page HPERC notification amending the Commission's 2012 regulations on recovering the cost of supplying electricity to consumers. It is issued at Shimla on 5 September 2018 (p1) and comes into force on publication in the Rajpatra, Himachal Pradesh, a date the document does not print (p1).

Regulation 1 gives the short title and commencement (p1). Regulation 2 rewrites the opening words of regulation 7(2) of the principal regulations so that the relief available when a consumer reduces connected load or contract demand applies only to reductions not attributed to clubbing of loads, and ties the treatment of the reduced demand to the consumer clearing all billed outstanding dues, including infrastructure development charges payable at the time of release of the original connection (p1).

Regulation 3 amends regulation 10 in five ways (p2): clause (ii) of the third proviso is dropped; clause (iv) of the third proviso is replaced with a condition that an applicant for a new connection clear all outstanding dues on the original connection and on every earlier connection at the premises, including infrastructure development charges on the permanently disconnected original connection; the fourth proviso and its explanation are omitted; the fifth proviso's cross-reference is narrowed to the third proviso alone; and two explanations are added — one defining "original connection" and how its load/demand is measured, excluding temporary reductions allowed under a tariff order, and one giving the third-proviso dues condition precedence over a general provision of the Himachal Pradesh Electricity Supply Code, 2009 (p2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document