Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018
Himachal Pradesh Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Fifth Amendment) Regulations, 2018
AmendmentDated 5 Sep 2018No. HPERC/419. dated 5th September, 2018
Amends the Recovery of Expenditure for Supply of Electricity Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page HPERC notification amending the Commission's 2012 regulations on recovering the cost of supplying electricity to consumers. It is issued at Shimla on 5 September 2018 (p1) and comes into force on publication in the Rajpatra, Himachal Pradesh, a date the document does not print (p1).
Regulation 1 gives the short title and commencement (p1). Regulation 2 rewrites the opening words of regulation 7(2) of the principal regulations so that the relief available when a consumer reduces connected load or contract demand applies only to reductions not attributed to clubbing of loads, and ties the treatment of the reduced demand to the consumer clearing all billed outstanding dues, including infrastructure development charges payable at the time of release of the original connection (p1).
Regulation 3 amends regulation 10 in five ways (p2): clause (ii) of the third proviso is dropped; clause (iv) of the third proviso is replaced with a condition that an applicant for a new connection clear all outstanding dues on the original connection and on every earlier connection at the premises, including infrastructure development charges on the permanently disconnected original connection; the fourth proviso and its explanation are omitted; the fifth proviso's cross-reference is narrowed to the third proviso alone; and two explanations are added — one defining "original connection" and how its load/demand is measured, excluding temporary reductions allowed under a tariff order, and one giving the third-proviso dues condition precedence over a general provision of the Himachal Pradesh Electricity Supply Code, 2009 (p2).
Read with this
The regulation
- Dated 18 May 2012Recovery of Expenditure for Supply of Electricity Regulations, 2012
Amendments and corrections
- Dated 22 Jul 2015Recovery of Expenditure for Supply of Electricity (First Amendment) Regulations, 2015
- Dated 21 Sep 2015Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2015
- Dated 19 Oct 2015Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2015
- Dated 23 Jan 2017Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fourth Amendment, 2017
- Dated 5 Aug 2024Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Sixth Amendment, 2024
Commencement notices and reasons
- Dated 18 May 2012Himachal Pradesh Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Statement of Reasons
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2017 — Order on draft amendments
- Dated 5 Sep 2018Recovery of Expenditure for Supply of Electricity (Fifth Amendment) Regulations, 2018 — Order
- Dated 3 Aug 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Finalisation Order
Procedures and orders made under it
- Dated 29 May 2012Fixation of Normative Infrastructure Development Charges, 2012 — Notification
- Dated 7 Jan 2013Normative Infrastructure Development Charges — Provisional Arrangements Extension, 2013
- Dated 5 Jun 2024Approval of Schedule of Service Connection Charges (IDC) under the Recovery of Expenditure Regulations, 2012, 2024
Earlier drafts
- Dated 9 Dec 2016Recovery of Expenditure for Supply of Electricity (Fourth Amendment) Regulations, 2016 — Draft
- Dated 20 Jul 2018Recovery of Expenditure for Supply of Electricity Regulations, 2012 — Fifth Amendment, 2018 — Draft
- Dated 22 May 2024Recovery of Expenditure for Supply of Electricity (Sixth Amendment) Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.