Skip to content

GERC · Gujarat Electricity Regulatory Commission

Appendix-I — RPO Compliance Format

Appendix-I – RPO Compliance Format

Annexure or form of a draftDated 30 Sep 2024

Draft

Voltaic holds no final regulation made from this draft.

Annexure or form of the Procurement of Energy from Renewable Sources Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Appendix-I, a collection of blank RPO compliance reporting formats rather than a regulation that sets RPO targets. It is organised for two audiences: distribution licensees (pp2–11) and open-access/captive consumers (pp12–23), with skeletal website-upload formats at pp24–25.

For DISCOMs, the first format captures energy purchase and consumption, including own generation, purchases from central/state/private generators and renewables, banking, sales and T&D losses (pp3–4). The second captures renewable procurement, RECs, solar under gross/net billing/net metering, green power sales, and computes RPO surplus/shortfall and cumulative position (pp5–6). Separate WPO, HPO, DRE and other RPO statements follow, keyed to MoP targets and project-commissioning cut-offs (pp7–10), ending with an abstract summary (p11).

For open-access and captive users, the formats first capture conventional energy consumption from CGPs/GCPs and open-access purchases (pp12–16), then Format-H for renewable energy available for RPO (pp17–18), source-specific WPO/HPO/DRE/other statements (pp19–22), and an abstract summary (p23). Each format requires declarations and sign/seal by an authorised signatory; OA/captive formats also require chartered-accountant sign/seal (pp4, p6, p11, p14, p16, p18, p23, p25). The text repeatedly points to GERC RPO Regulations, CERC REC Regulations 2022 and MoP orders, leaving targets to those instruments.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Procedures and orders made under it

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document