GERC · Gujarat Electricity Regulatory Commission
Appendix-I — RPO Compliance Format
Appendix-I – RPO Compliance Format
Annexure or form of a draftDated 30 Sep 2024
Draft
Voltaic holds no final regulation made from this draft.
Annexure or form of the Procurement of Energy from Renewable Sources Regulations, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is Appendix-I, a collection of blank RPO compliance reporting formats rather than a regulation that sets RPO targets. It is organised for two audiences: distribution licensees (pp2–11) and open-access/captive consumers (pp12–23), with skeletal website-upload formats at pp24–25.
For DISCOMs, the first format captures energy purchase and consumption, including own generation, purchases from central/state/private generators and renewables, banking, sales and T&D losses (pp3–4). The second captures renewable procurement, RECs, solar under gross/net billing/net metering, green power sales, and computes RPO surplus/shortfall and cumulative position (pp5–6). Separate WPO, HPO, DRE and other RPO statements follow, keyed to MoP targets and project-commissioning cut-offs (pp7–10), ending with an abstract summary (p11).
For open-access and captive users, the formats first capture conventional energy consumption from CGPs/GCPs and open-access purchases (pp12–16), then Format-H for renewable energy available for RPO (pp17–18), source-specific WPO/HPO/DRE/other statements (pp19–22), and an abstract summary (p23). Each format requires declarations and sign/seal by an authorised signatory; OA/captive formats also require chartered-accountant sign/seal (pp4, p6, p11, p14, p16, p18, p23, p25). The text repeatedly points to GERC RPO Regulations, CERC REC Regulations 2022 and MoP orders, leaving targets to those instruments.
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.