GERC · Gujarat Electricity Regulatory Commission
Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (First Amendment) Regulations, 2013
Draft amendmentDated 6 Nov 2013
Draft
A proposal that has since been finalised as the Procurement of Energy from Renewable Sources Regulations, 2010 — First Amendment, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to GERC's 2010 renewable-energy procurement regulations, issued by the Gujarat Electricity Regulatory Commission and signed at Gandhinagar on 6 November 2013 (p3). It extends to the whole of Gujarat and comes into force on publication in the Official Gazette, a date the document does not print (p1).
The amendment does three substantive things. Clause 3 inserts a new Regulation 2.1(aa) into the Principal Regulations, defining 'Average Power Purchase Cost' as the weighted average pooled price at which a distribution licensee bought electricity — including self-generation — from all long-term and short-term suppliers in the previous year, excluding renewable-energy-based sources (p2). Clause 4 replaces the renewable purchase obligation table in the Principal Regulations, restating the year-wise obligation trajectory from 2010-11 through 2016-17 and splitting each year's total between wind, solar and 'others' (biomass, bagasse, MSW) (p2). Clause 5 adds Regulations 5.4 and 5.5: the Commission is to determine APPC annually; a distribution licensee must pay it when buying the electrical component of renewable projects registered under the CERC REC scheme; and must also pay it for surplus energy remaining after set-off by captive consumers and open access consumers taking third-party sale (p2–3).
Clauses 1–2 carry only the short title, extent and commencement (p1).
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.