GERC · Gujarat Electricity Regulatory Commission
Procurement of Energy from Renewable Sources Regulations, 2010 — First Amendment, 2014
Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (First Amendment) Regulations, 2014
AmendmentDated 4 Mar 2014No. 2 of 2014 dated 04 /03 /2014
Replaced by Procurement of Energy from Renewable Sources Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Procurement of Energy from Renewable Sources Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission's First Amendment to its 2010 renewable procurement regulations (Notification No. 2 of 2014, signed 4 March 2014) makes three targeted changes to the parent framework (p1, p3).
Section 3 inserts a definition of Average Power Purchase Cost into Regulation 2.1 of the Principal Regulations: the weighted average pooled price at which a distribution licensee bought electricity in the previous year, including the cost of self-generation but excluding supply from renewable sources (p2).
Section 5 adds Regulations 5.4 and 5.5. These require the Commission to determine that cost annually for each distribution licensee, and oblige the licensee to pay it — for the electrical component of renewable projects registered under CERC's REC scheme, and to REC-scheme RE generators selling to captive users or third parties in respect of energy surplus to that consumption (p3). The payment obligation attaching to these two clauses is backdated to 1 April 2014 (p1).
Section 4 substitutes Table 1 of Regulation 4.1, restating year-wise renewable purchase obligation percentages split between wind, solar and other technologies, with the trajectory running through 2016-17 (p2). The substituted table re-states obligations for years preceding the amendment itself.
Section 1 gives the short title and Gujarat-wide extent, and defers commencement to Gazette publication except for the two new cost-pass-through clauses (p1). The Gazette date is not printed in this text.
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.